My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Burlington Northern Santa Fe (BNSF) 8/29/2016
>
Contracts
>
Agreement
>
Burlington Northern Santa Fe (BNSF) 8/29/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2016 10:56:21 AM
Creation date
9/26/2016 10:55:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Burlington Northern Santa Fe (BNSF)
Approval Date
8/29/2016
Council Approval Date
8/24/2016
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Overpass
Tracking Number
0000281
Total Compensation
$70,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B/VF <br /> RAILWAY <br /> EXHIBIT "C" <br /> CONTRACTOR REQUIREMENTS <br /> 1.01 General: <br /> • 1.01.01 The Contractor must cooperate with BNSF RAILWAY COMPANY, <br /> hereinafter referred to as "Railway" where work is over or under on or adjacent to <br /> Railway property and/or right-of-way, hereafter referred to as "Railway Property", <br /> during the construction of the Grand Avenue (Utility and Pedestrian) Bridge. <br /> • 1.01.02 The Contractor must execute and deliver to the Railway duplicate copies <br /> of the Exhibit "C-1" Agreement, in the form attached hereto, obligating the Contractor <br /> to provide and maintain in full force and effect the insurance called for under Section <br /> 3 of said Exhibit "C-1". Questions regarding procurement of the Railroad Protective <br /> Liability Insurance should be directed to Rosa Martinez at Marsh, USA, 214-303- <br /> 8519. <br /> • 1.01.03 The Contractor must plan, schedule and conduct all work activities so as <br /> not to interfere with the movement of any trains on Railway Property. <br /> • 1.01.04 The Contractor's right to enter Railway's Property is subject to the <br /> absolute right of Railway to cause the Contractor's work on Railway's Property to <br /> cease if, in the opinion of Railway, Contractor's activities create a hazard to <br /> Railway's Property, employees, and/or operations. Railway will have the right to stop <br /> construction work on the Project if any of the following events take place: (i) <br /> Contractor (or any of its subcontractors) performs the Project work in a manner <br /> contrary to the plans and specifications approved by Railway; (ii) Contractor (or any <br /> of its subcontractors), in Railway's opinion, prosecutes the Project work in a manner <br /> which is hazardous to Railway property, facilities or the safe and expeditious <br /> movement of railroad traffic; (iii) the insurance described in the attached Exhibit C-1 <br /> is canceled during the course of the Project; or (iv) Contractor fails to pay Railway <br /> for the Temporary Construction License or the Easement. The work stoppage will <br /> continue until all necessary actions are taken by Contractor or its subcontractor to <br /> rectify the situation to the satisfaction of Railway's Division Engineer or until <br /> additional insurance has been delivered to and accepted by Railway. In the event of <br /> a breach of (i) this Agreement, (ii) the Temporary Construction License, or (iii) the <br /> Easement, Railway may immediately terminate the Temporary Construction License <br /> or the Easement. Any such work stoppage under this provision will not give rise to <br /> any liability on the part of Railway. Railway's right to stop the work is in addition to <br /> any other rights Railway may have including, but not limited to, actions or suits for <br /> 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.