My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Burlington Northern Santa Fe (BNSF) 8/29/2016
>
Contracts
>
Agreement
>
Burlington Northern Santa Fe (BNSF) 8/29/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2016 10:56:21 AM
Creation date
9/26/2016 10:55:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Burlington Northern Santa Fe (BNSF)
Approval Date
8/29/2016
Council Approval Date
8/24/2016
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Overpass
Tracking Number
0000281
Total Compensation
$70,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BNSF <br /> RA/LWAY <br /> damages or lost profits. In the event that Railway desires to stop construction work <br /> on the Project, Railway agrees to immediately notify the following individual in <br /> writing: <br /> Heather Griffin, P.E. I Principal Engineer <br /> 425.257.7206 <br /> hgriffin@everettwa.gov <br /> • 1.01.05 The Contractor is responsible for determining and complying with all <br /> Federal, State and Local Governmental laws and regulations, including, but not <br /> limited to environmental laws and regulations (including but not limited to the <br /> Resource Conservation and Recovery Act, as amended; the Clean Water Act, the <br /> Oil Pollution Act, the Hazardous Materials Transportation Act, CERCLA), and health <br /> and safety laws and regulations. The Contractor hereby indemnifies, defends and <br /> holds harmless Railway for, from and against all fines or penalties imposed or <br /> assessed by Federal, State and Local Governmental Agencies against the Railway <br /> which arise out of Contractor's work under this Agreement. <br /> • 1.01.06 The Contractor must notify (Agency) at and Railway's <br /> Manager Public Projects, telephone number ( ) at least thirty (30) calendar <br /> days before commencing any work on Railway Property. Contractor's notification to <br /> Railway must refer to Railway's file <br /> • 1.01.07 For any bridge demolition and/or falsework above any tracks or any <br /> excavations located with any part of the excavations located within, whichever is <br /> greater, twenty-five (25) feet of the nearest track or intersecting a slope from the <br /> plane of the top of rail on a 2 horizontal to 1 vertical slope beginning at eleven (11) <br /> feet from centerline of the nearest track, both measured perpendicular to center line <br /> of track, the Contractor must furnish the Railway five sets of working drawings <br /> showing details of construction affecting Railway Property and tracks. The working <br /> drawing must include the proposed method of installation and removal of falsework, <br /> shoring or cribbing, not included in the contract plans and two sets of structural <br /> calculations of any falsework, shoring or cribbing. For all excavation and shoring <br /> submittal plans, the current "BNSF-UPRR Guidelines for Temporary Shoring" must <br /> be used for determining the design loading conditions to be used in shoring design, <br /> and all calculations and submittals must be in accordance with the current "BNSF- <br /> UPRR Guidelines for Temporary Shoring". All submittal drawings and calculations <br /> must be stamped by a registered professional engineer licensed to practice in the <br /> state the project is located. All calculations must take into consideration railway <br /> surcharge loading and must be designed to meet American Railway Engineering <br /> and Maintenance-of-Way Association (previously known as American Railway <br /> Engineering Association) Coopers E-80 live loading standard. All drawings and <br /> calculations must be stamped by a registered professional engineer licensed to <br /> practice in the state the project is located. The Contractor must not begin work until <br /> 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.