Laserfiche WebLink
BN. F <br /> R / W.vr <br /> • 15'-0" Horizontally from centerline of nearest track <br /> • 21'-6" Vertically above top of rail <br /> • 27'-0" Vertically above top of rail for electric wires carrying less than 750 <br /> volts <br /> • 28'-0" Vertically above top of rail for electric wires carrying 750 volts to <br /> 15,000 volts <br /> • 30'-0" Vertically above top of rail for electric wires carrying 15,000 volts to <br /> 20,000 volts <br /> • 34'-0" Vertically above top of rail for electric wires carrying more than <br /> 20,000 volts <br /> • 1.03.04 Upon completion of construction, the following clearances shall be <br /> maintained: [Note to Drafter: The vertical clearance should mirror the final <br /> negotiated design clearance] <br /> • 25' Horizontally from centerline of nearest track <br /> • 23' 6" Vertically above top of rail <br /> • 1.03.05 Any infringement within State statutory clearances due to the Contractor's <br /> operations must be submitted to the Railway and to the (Agency) and must not be <br /> undertaken until approved in writing by the Railway, and until the (Agency) has <br /> obtained any necessary authorization from the State Regulatory Authority for the <br /> infringement. No extra compensation will be allowed in the event the Contractor's <br /> work is delayed pending Railway approval, and/or the State Regulatory Authority's <br /> approval. <br /> • 1.03.06 In the case of impaired vertical clearance above top of rail, Railway will <br /> have the option of installing tell-tales or other protective devices Railway deems <br /> necessary for protection of Railway operations. The cost of tell-tales or protective <br /> devices will be borne by the Agency. <br /> • 1.03.07 The details of construction affecting the Railway's Property and tracks not <br /> included in the contract plans must be submitted to the Railway by (Agency) for <br /> approval before work is undertaken and this work must not be undertaken until <br /> approved by the Railway. <br /> • 1.03.08 At other than public road crossings, the Contractor must not move any <br /> equipment or materials across Railway's tracks until permission has been obtained <br /> from the Railway. The Contractor must obtain a "Temporary Construction Crossing <br /> Agreement" from the Railway prior to moving his equipment or materials across the <br /> Railways tracks. The temporary crossing must be gated and locked at all times when <br /> not required for use by the Contractor. The temporary crossing for use of the <br /> Contractor will be constructed and, at the completion of the project, removed at the <br /> expense of the Contractor. <br /> 35 <br />