Laserfiche WebLink
B/VSF- <br /> NA/L WAY <br /> • 1.03.09 Discharge, release or spill on the Railway Property of any hazardous <br /> substances, oil, petroleum, constituents, pollutants, contaminants, or any hazardous <br /> waste is prohibited and Contractor must immediately notify the Railway's Resource <br /> Operations Center at 1(800) 832-5452, of any discharge, release or spills in excess <br /> of a reportable quantity. Contractor must not allow Railway Property to become a <br /> treatment, storage or transfer facility as those terms are defined in the Resource <br /> Conservation and Recovery Act or any state analogue. <br /> • 1.03.10 The Contractor upon completion of the work covered by this contract, <br /> must promptly remove from the Railway's Property all of Contractor's tools, <br /> equipment, implements and other materials, whether brought upon said property by <br /> said Contractor or any Subcontractor, employee or agent of Contractor or of any <br /> Subcontractor, and must cause Railway's Property to be left in a condition <br /> acceptable to the Railway's representative. <br /> 1.04 Contractor Roadway Worker on Track Safety Program and Safety <br /> Action Plan: <br /> • 1.04.01 Each Contractor that will perform work within 25 feet of the <br /> centerline of a track must develop and implement a Roadway Worker <br /> Protection/On Track Safety Program and work with Railway Project <br /> Representative to develop an on track safety strategy as described in the <br /> guidelines listed in the on track safety portion of the Safety Orientation. This <br /> Program must provide Roadway Worker protection/on track training for all <br /> employees of the Contractor, its subcontractors, agents or invitees. This training <br /> is reinforced at the job site through job safety briefings. Additionally, each <br /> Contractor must develop and implement the Safety Action Plan, as provided for <br /> on the web site http://bnsfcontractor.com/, which will be made available to <br /> Railway prior to commencement of any work on Railway Property. During the <br /> performance of work, the Contractor must audit its work activities. The Contractor <br /> must designate an on-site Project Supervisor who will serve as the contact <br /> person for the Railway and who will maintain a copy of the Safety Action Plan, <br /> safety audits, and Material Safety Datasheets (MSDS), at the job site. <br /> • 1.04.02 Contractor shall have a background investigation performed on all of its <br /> employees, subcontractors and agents who will be performing any services for <br /> Railroad under this Agreement which are determined by Railroad in its sole <br /> discretion a) to be on Railroad's property, or b) that require access to Railroad <br /> Critical Infrastructure, Railroad Critical Information Systems, Railroad's Employees, <br /> Hazardous Materials on Railroad's property or is being transported by or otherwise <br /> in the custody of Railroad, or Freight in Transit involving Railroad. <br /> 36 <br />