My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Burlington Northern Santa Fe (BNSF) 8/29/2016
>
Contracts
>
Agreement
>
Burlington Northern Santa Fe (BNSF) 8/29/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2016 10:56:21 AM
Creation date
9/26/2016 10:55:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Burlington Northern Santa Fe (BNSF)
Approval Date
8/29/2016
Council Approval Date
8/24/2016
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Overpass
Tracking Number
0000281
Total Compensation
$70,000.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUTHORITY FOR EXPENDITURE <br /> LOCATION: BAYSIDE LINE SEGMENT: 50 AFE NUMBER: <br /> PLANITEM NUMBER: 229555001 MILEPOST: 34.35 RFA NUMBER: 5905917 <br /> PROPERTY OF: BNSF RAILWAY COMPANY DIVISION: NW CPAR NUMBER: C0000009 <br /> OPERATED BY: BNSF RAILWAY COMPANY SUBDIVISION: BAYSIDE SPUR BUDGET YEAR: 2017 <br /> JOINT FACILITY: CITY OF EVERETT,WA TRACK TYPE: 6 BUDGET CLASS: 6 <br /> %BILLABLE(+/-): 100.0 TAX STATE: WA REPORTING OFFICE: 716 <br /> SPONSOR: VP ENGINEERING CENTER/ROLLUP: 29125 <br /> PURPOSE,JUSTIFICATION AND DESCRIPTION <br /> PIP FLAGGING NWW DIV BAYSIDE SPUR SUB LS 50 MP 34.35-100%BILLABLE TO CITY OF EVERETT,WA-FLAGGING FOR GARND <br /> AVENUE PEDESTRIAN/UTILITY BRIDGE OVER BAYSIDE SPUR-EVERETT,WA <br /> PRIMARY FUNDING SOURCE IS CITY FUNDS <br /> PLAN ITEM LINE SEG BEG MP END MP TRK NBR BEGIN STATION END STATION PROJECT TYPE BUD YEAR <br /> 229555001 50 34.35 34.35 6 BAYSIDE BAYSIDE FLAGGING 2017 <br /> • <br /> CASH CAPITAL NONCASH CAPITAL OPERATING EXP REMOVAL COSTS BILLABLE TOTALS <br /> LABOR COSTS 0 0 0 0 129,104 129,104 <br /> MATERIAL COSTS 0 0 0 0 0 0 <br /> OTHER COSTS 0 0 0 0 27,663 27,663 <br /> TOTALS 0 0 0 0 156,767 156,767 <br /> SYSTEM MAINTENANCE AND PLANNING PRINTED ON: 08/11/2016 <br /> ESTIMATE REF.NUMBER: 5905917 ESTIMATED BY: Elkins <br /> COSTING DATE: 01/01/2017 PRINTED BY: Elkins <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.