Laserfiche WebLink
***** MAINTAIN PROPRIETARY CONFIDENTIALITY ***** <br /> BNSF RAILWAY COMPANY <br /> FHPM ESTIMATE FOR <br /> CITY OF EVERETT,WA <br /> LOCATION BAYSIDE DETAILS OF ESTIMATE PLAN ITEM: 229555001 VERSION: 1 <br /> PURPOSE,JUSTIFICATION AND DESCRIPTION <br /> PIP FLAGGING NWW DIV BAYSIDE SPUR SUB LS 50 MP 34.35-100%BILLABLE TO CITY OF EVERETT,WA <br /> FLAGGING FOR GARND AVENUE PEDESTRIAN/UTILITY BRIDGE OVER BAYSIDE SPUR-EVERETT,WA <br /> REQUESTOR:BRUCE SPARLING 08/11/16 <br /> PRIMARY FUNDING SOURCE IS CITY FUNDS <br /> DESCRIPTION QUANTITY U/M COST TOTAL$ <br /> ******5*** <br /> LABOR <br /> ********** <br /> FLAGGING-GRADING-CAP 1440.0 MH 44,151 <br /> PAYROLL ASSOCIATED COSTS 26,583 <br /> DA OVERHEADS 40,406 <br /> EQUIPMENT EXPENSES 10,552 <br /> INSURANCE EXPENSES 7,412 <br /> TOTAL LABOR COST 129,104 129,104 <br /> ************* <br /> MATERIAL <br /> TOTAL MATERIAL COST 0 0 <br /> ********** <br /> OTHER <br /> ********** <br /> RENTAL VEHICLE 120.0 DAY 12,000 <br /> TOTAL OTHER ITEMS COST 12,000 12,000 <br /> PROJECT SUBTOTAL 141,104 <br /> CONTINGENCIES 14,110 <br /> BILL PREPARATION FEE 1,553 <br /> GROSS PROJECT COST 156,767 <br /> LESS COST PAID BY BNSF 0 <br /> TOTAL BILLABLE COST 156,767 <br /> Page 2 of 2 <br />