Laserfiche WebLink
" " MAINTAIN PROPRIETARY CONFIDENTIALITY ***** <br /> BNSF RAILWAY COMPANY <br /> FHPM ESTIMATE FOR <br /> CITY OF EVERETT,WA <br /> LOCATION BAYSIDE DETAILS OF ESTIMATE PLAN ITEM: 229555000 VERSION: 1 <br /> PURPOSE,JUSTIFICATION AND DESCRIPTION <br /> PIP INSPECTOR COORDINATOR NWW DIV BAYSIDE SPUR SUB LS 50 MP 34.35-100%BILLABLE TO CITY OF EVERETT,WA <br /> INSPECTION FOR GRAND AVE PEDESTRIAN BRIDGE-BAYSIDE YARD EVERETT,WA <br /> REQUESTOR:BRUCE SPARLING 08/11/16 <br /> PRIMARY FUNDING SOURCE IS CITY FUNDS <br /> DESCRIPTION QUANTITY U/M COST TOTAL$ <br /> ********** <br /> LABOR <br /> TOTAL LABOR COST 0 0 <br /> MATERIAL <br /> ************* <br /> TOTAL MATERIAL COST 0 0 <br /> +********* <br /> OTHER <br /> ********** <br /> CIVIL DESIGN/CM 1.0 LS 2,400 <br /> INSPECTOR COORDINATOR 40.0 DAY 40,000 <br /> TOTAL OTHER ITEMS COST 42,400 42,400 <br /> PROJECT SUBTOTAL 42,400 <br /> CONTINGENCIES 4,240 <br /> BILL PREPARATION FEE 467 <br /> GROSS PROJECT COST 47,107 <br /> LESS COST PAID BY BNSF 0 <br /> TOTAL BILLABLE COST 47,107 <br /> Page 2 of 2 <br />