My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stantec Consulting Services Inc. 9/19/2016
>
Contracts
>
6 Years Then Destroy
>
2017
>
Stantec Consulting Services Inc. 9/19/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 11:57:39 AM
Creation date
9/27/2016 11:57:29 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stantec Consulting Services Inc.
Approval Date
9/19/2016
End Date
3/31/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q design assistance
Public Works WO Number
UP 3612
Tracking Number
0000289
Total Compensation
$20,767.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oli''' Stantec Exhibit <br /> Scope of Work <br /> City of Everett <br /> EXHIBIT A <br /> SCOPE OF WORK <br /> City of Everett <br /> Water Main Replacement "Q" Project <br /> PROJECT DESCRIPTION AND PURPOSE <br /> Water Main Replacement "Q" will line approximately 2,500 linear feet of 12" cast iron <br /> water main on Evergreen Way. <br /> The scope of work includes the preparation of CIPP specifications, an opinion of <br /> probable construction cost and related services. <br /> SCOPE OF SERVICES AND TASKS <br /> The scope of services for this project consists of the following tasks: <br /> 200. Project Management <br /> Provide initial and ongoing project management of the project. <br /> • Prepare project plan <br /> • Conduct project kickoff meeting <br /> • Prepare monthly status reports <br /> • Manage staff and tasks <br /> 201. Quality Assurance/Quality Control & Bidding Assistance <br /> Provide internal quality assurance and quality control review of CIPP <br /> recommendations. Provide overall bid document QA/QC review of Everett <br /> produced 90% design contract document set. Provide recommendations for <br /> procurement strategy and evaluation criteria for bids for CIPP portion of project. <br /> Deliverable: Review comments on Everett's 90% contract document submittal to <br /> Stantec. <br /> 202. Preparation of CIPP Specification section and recommendations <br /> Tasks may include the following: <br /> • Review existing survey information provided by City <br /> • Provide Access pit recommendations <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.