My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stantec Consulting Services Inc. 9/19/2016
>
Contracts
>
6 Years Then Destroy
>
2017
>
Stantec Consulting Services Inc. 9/19/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 11:57:39 AM
Creation date
9/27/2016 11:57:29 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stantec Consulting Services Inc.
Approval Date
9/19/2016
End Date
3/31/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q design assistance
Public Works WO Number
UP 3612
Tracking Number
0000289
Total Compensation
$20,767.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec Exhibit <br /> Scope of Work <br /> City of Everett <br /> • Prepare 90% CIPP specifications and opinion of probable construction cost <br /> (OPCC) <br /> • Submit 90% CIPP specifications, recommendations and CIPP OPCC to the <br /> City for review <br /> • Revise documents to consider City review comments. <br /> Deliverables: Electronic copies of documents produced including pit <br /> recommendations, CIPP specifications and CIPP OPCC in format requested by <br /> the City. <br /> ITEMS NOT INCLUDED IN THIS SCOPE OF SERVICES <br /> The following services are not included in this Scope of Services. If, during the course of <br /> the project, the need for any of these services is identified, an adjustment to this Scope <br /> or an additional Scope of Services will be needed. <br /> • Environmental studies <br /> • Survey <br /> • Potholing of any existing underground utilities <br /> • Bidding assistance beyond that described in scope <br /> • Additional design meetings or submittals beyond what is specified <br /> • Permit research, preparation of applications, SEPA checklist preparation, and <br /> other permit and agency-related reviews and approvals <br /> • Easement investigation, preparation, negotiation, and acquisition <br /> • Construction staking. <br /> • Administration of the construction contract <br /> • Preparation of Design Plans <br /> • Construction Support <br /> END OF EXHIBIT A <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.