Laserfiche WebLink
Sprint <br /> NEW BBU NEW LOAD <br /> CABINET MMBS CENTER <br /> CABINET 491M <br /> s a 3 2 1 o GENERAL DYNAMICS <br /> WIRELESS SERVICES <br /> 1/0 AWG <br /> JENGINEERING <br /> 'RJJECT INFOKM\TIJ\: <br /> MMBS PORT LAYOUT <br /> N 6 AWG SEE ELECTRICAL ONE NETWORK VISION MMBS L\LINA I <br /> CONDUIT NO. USAGE LINE DIAGRAM <br /> SECTOR 1 <br /> 0 BATTERY SECTOR 2 BROADWAY <br /> REFER TO HYBRID CABLE SPECS <br /> 1 AC/GROUND SECTOR 3 SE63XC209 <br /> 2 RRU SECTOR 12517 HOWARD AVE <br /> DC POWER ELECTRICAL NOTES; DC CABLING WITHIN PRE EVERETT, WA 98203 <br /> MANUFACTURED HYBRID CABLES <br /> 3 RRU SECTOR 2 1. MINIMUM CABLE LENGTH BETWEEN THE OU AND BATTERY IS 70MM (2.75 in) SNOHOMISH COUNTY <br /> 2. MAXIMUM CABLE LENGTH DISTANCE IS 900mm (35.43 in). <br /> 4 RRU SECTOR 3 WEATHER PROOFING SHALL INCORPORATE PPC WEATHERPROOFING TAPE KIT, ISSUE DATE <br /> COLD SHRINK SHALL NOT BE USED. <br /> 07-30-12 <br /> 5 BATTERY 3. ROUTE DC CONDUCTORS IN CONDUITS TO NEW MMBS CABINET 48VDC POWER <br /> DISTRIBUTION PANEL TO AND FROM NEW BBU CABINET. ISSUED FOR: ZONING/PERMITTING <br /> 4. —48 VDC CABLES BETWEEN NEW MMBS CABINET & RRU'S ARE FACTORY <br /> ASSEMBLED AND EQUIPED WITH ONE PRE—TERMINATED END. REVISIONS <br /> 5. ALL FIELD INSTALLED OC CABLING SHALL BE TYPE RHH/RHW AND SHALL BE REV. 041E DESCRIPTION IMMALS <br /> UL THERMOSET INSULATED. q 7/30/12 909. CD'S J.F. <br /> 22"x34"SCALE: NOT TO SCALE DC POWER DIAGRAM 1 22`:34" SCALE: NOT TO SCALE NOT USED 2 0 09/12/12 1009 RLS <br /> 11'x17'SCALE: NOT TO SCALE 11`x17" SCALE: NOT TO SCALE <br /> 2" SEAL TITS 90` CONDUIT <br /> CONNECTOR P/N:500007 OR <br /> EQUIVALENT <br /> Ll <br /> O NEW O NEW EQUIPMENT <br /> MMBS <br /> CABINET NOT FOR CONSTRUCTION UNLESS <br /> LABELED AS CONSTRUCTION SET <br /> LI,I ASURL: <br /> SEAL TITE CONNECTION -------- --- <br /> SHEET—DETAIL D <br /> O <br /> 2" SEAL TRE FLEXIBLE CONDUIT <br /> FROM STUB UP TO EQUIPMENT <br /> (6'-0' MAX.) <br /> I <br /> 2" HEAVY WALL COUPLING <br /> 2" SEAL TRE STRAIGHT <br /> CONNECTOR <br /> I <br /> EQUIPMENT PLATFORM <br /> 2" SEAL TITE FLEXIBLE CONDUIT <br /> it IFET TITLE <br /> EQUIPMENT <br /> 2" PVC TO STUB UP D C POWER O N E—I_ <br /> AT EQUIPMEME NT LOCATION <br /> DIAGRAM <br /> SHEET NUMBER RE\ISION: <br /> 0 <br /> 22`x34 SCALE: NOT TO SCALEEQUIPPOWER CONDUIT CONNECTIONS 3 22`x34" SCALE: NOT TO SCALE SEAL TITE POWER CONDUIT CONNECTION 4. 22"x34"SCALE: NOT TO SCALE ENOT USED 5 -2 1 253-080 \ <br /> 11`x17 .`SCALE: NOT TO SCALE 11`x17` SCALE: NOT TO SCALE 11"x17`SCALE: NOT TO SCALE <br /> THE INFORMATION CONTAINED IN THIS SET OF CONSTRUCTION DOCUMENTS IS PROPRIETARY BY NATURE. ANY USE OR DISCLOSURE OTHER THAN THAT WHICH RELATES TO CARRIER SERVICES IS STRICTLY PROHIBITED. /5 -1 <br /> /Vl, <br />