My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1209 MADRONA AVE 2016-10-05
>
Address Records
>
MADRONA AVE
>
1209
>
1209 MADRONA AVE 2016-10-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2016 7:04:00 AM
Creation date
9/30/2016 4:12:32 PM
Metadata
Fields
Template:
Address Document
Street Name
MADRONA AVE
Street Number
1209
Notes
GEOTECHNICAL REPORT INCLUDED
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Retaining Wall Installation Final Letter NGA File No.8710B13 <br /> Packer Retaining Wall February 17,2015 <br /> Everett,Washington Page 2 <br /> "Geotechnical Engineering Evaluation—Packer Property—Retaining Walls and Steep Slope Evaluation— <br /> Everett,Washington,"dated March 11,2013. During that study,we recommended a retaining wall within <br /> the ravine in the area of the landslide to stabilize the affected area along with drainage improvements and <br /> covering the slope within the vicinity of the new wall with erosion control material and vegetation. We <br /> subsequently prepared a plan review letter for the proposed retaining wall dated June 30, 2014 that <br /> provided recommendations for a shotcrete wall supported on pin piles and restrained using grouted tie <br /> back anchors. We have since monitored wall installation. <br /> Site Observations <br /> We monitored wall installation activities on a part-time basis from September 17, 2014 through <br /> November 21, 2014. Our observations during wall installation at this project were documented in Field <br /> Reports 1 through 11, which have been submitted to you. The wall is located along the lower tier of a <br /> series of tiered block walls within the steep slope ravine area to the north-west of your residence. <br /> We observed the installation of six grouted tieback anchors throughout the wall alignment. The tiebacks <br /> consisted of 4-inch diameter holes that were drilled to a depth of 40 feet behind the face of the excavation. <br /> The anchors were installed at an approximate angle of 20 degrees below horizontal. After the holes were <br /> drilled, 20-foot pvc pipe bond breakers were installed in the upper portion of the anchor along with <br /> threaded hollow metal anchor rods connected with threaded couplers to the depth of the drilled holes. <br /> Grout was pumped through the 32-mm diameter hollow steel anchor rods into the holes until the grout <br /> was observed flowing out of the drilled holes. After the grout was allowed to cure, we returned to <br /> conduct a load test on one of the grouted tieback anchors to verify the load carrying capacity. We <br /> conducted the test on Tieback A4. The tieback was tested in 25% increments of the design load to a <br /> maximum load of 150% of the design load of 9.9 kips. We observed minimal movement of the anchor <br /> during the testing and the hold periods, and the tested anchor appeared to perform well. In our opinion, <br /> all of the anchors were installed in accordance to the plans and our recommendations. <br /> We observed the installation of 11, 2-inch diameter schedule 80 piles that were driven with a 140-pound <br /> air hammer to a total embedment depth in the range of 7.0 feet to 10.9 feet below ground surface along <br /> the wall alignment. All of the piles were driven to the recommended refusal rate of less than 1-inch of <br /> movement in 60 seconds of driving. In our opinion, the pin piles were installed in accordance with our <br /> recommendations and the approved plans, and should support the wall. <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br /> 3l � <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.