Laserfiche WebLink
w <br /> project developer is responsible for coordination with the District's Substation <br /> Engineering department in regard to the substation. <br /> Cost of any work,new or upgrade,to existing facilities that is required to connect this <br /> proposed development to the District electric system shall be in accordance with the <br /> applicable District policy. The development will be required to supply the District with <br /> suitable locations/easements upon their property for any underground electrical facilities <br /> that must be installed to serve the proposed development. Contact with the District is <br /> recommended prior to design of the proposed project. <br /> For information about specific electrical service requirements,please call the District's <br /> Everett office at(425)783-8272 to contact a Customer Engineer. <br /> Appeals: This is an administrative decision that is appealable to the City's Land Use <br /> Hearing Examiner. Appeal forms are available from the Planning Department Permit <br /> Services Counter located at 3200 Cedar Street,2nd Floor, and must be submitted along with <br /> the required filing fee by 5 p.m. on February 10,2014. If you have any questions,please <br /> call Dave Tyler at(425)257-8731. <br /> Date: January 27,2014 <br /> Allan <br /> Gi n,Director <br /> Pl ' g and Community Development Department <br /> J <br />