Laserfiche WebLink
alternatives or modifications to the proposed project or may deny the project if the City <br /> determines that reasonable mitigation measures are insufficient to mitigate the project's <br /> impacts. <br /> 9.5 Detailed alternatives analysis. When the Responsible Official finds that despite the <br /> incorporation of reasonable mitigation measures, the proposal is likely to have a significant <br /> adverse environmental impact on level of service or other aspects of the transportation network, <br /> the Responsible Official shall issue a Determination of Significance. If the sole issue is traffic, <br /> the applicant shall prepare a limited scope EIS on traffic. If there are other probable significant <br /> adverse environment impacts, the EIS will be scoped accordingly. <br /> The EIS scope with respect to transportation shall contain an analysis of all reasonable <br /> courses of action and mitigation measures, including TDM measures, that would avoid or <br /> otherwise mitigate the probable significant environmental impact related to transportation. On <br /> the basis of this analysis, the Responsible Official, upon review and analysis by the City <br /> Engineer, shall determine whether reasonable mitigation measures are sufficient to mitigate the <br /> identified significant adverse transportation impact. <br /> 9.6 Applicant's options. At any time in the project review process, the applicant may: <br /> 1. Choose not to proceed with the project. <br /> 2. Implement measures identified by the City to address the adverse transportation impacts. <br /> 3. Propose revisions to the project to avoid or reduce the identified impacts and document <br /> the revisions in accordance with the City's project review procedures (including EMC <br /> 20.01.160 if applicable) and section 13 of this chapter. The modifications must be <br /> approved by the City Engineer and the Responsible Official. Possible measures include <br /> van/car pooling programs, pedestrians and bicycle improvements, incentives to <br /> encourage public transportation ridership, or other measures that, in the opinion of the <br /> City Engineer and the Responsible Official, would adequately address the transportation <br /> impact. <br /> 9.7 Table 2 summarizes the requirements for payment of fees for transportation system <br /> improvements to mitigate impacts of proposed projects, as specified in sections 10 and 11 of this <br /> chapter. <br /> Table 2: General Requirements for Fees Related to System Improvements <br /> Number of Trips Generated: Level of Service at Horizon Year: Fee Calculation: <br /> Fewer than 10 new vehicle trips per (not applicable;no traffic study) 0 <br /> day <br /> • <br /> • <br /> 10 or more new vehicle trips per (not applicable;no traffic study) Fee for each peak hour trip per <br /> day, and not more than 50 section 10.4 <br /> additional peak hour trips* <br /> -7- <br />