Laserfiche WebLink
More than 50 additional peak hour 1. Fee for fair share of planned system <br /> trips* improvements(e.g. identified in the <br /> City's six year transportation Fee for each peak hour trip per <br /> improvement program)— section 10.4 <br /> plus: plus: <br /> 2. Fair share of additional <br /> improvements, if any,to maintain <br /> acceptable levels of service as a result <br /> of the proposed project, as follows: <br /> If"D"or better at horizon year and no <br /> need for additional improvements 0 <br /> (taking growth into account)--> <br /> Project alone causes need for <br /> additional improvements at horizon <br /> year(no need if project did not occur, <br /> taking growth into account)—> 100%of cost of improvements <br /> Additional improvements needed to Project's%of total peak hour trips <br /> maintain"D"or better at horizon at horizon year,minus existing <br /> year,due to project and growth—> peak hour volume <br /> Additional improvements needed at Project's%of total peak hour trips <br /> horizon year due to project and at horizon year <br /> growth,but current level of service is <br /> "E"or"F"--> <br /> * for proposed projects in core area, <br /> trip calculation at 75% of ITE Trip <br /> Generation Manual or as justified in <br /> a traffic analysis <br /> Section 10: Fair share of system improvements <br /> 10.1 Two components of fair share. This section specifies the mitigation for transportation <br /> system improvements, unless otherwise agreed by the City Traffic Engineer. The fair share shall <br /> consist of two components: <br /> 1. A fee for each peak hour trip calculated to provide a fair share, attributed to new <br /> development, of the cost of "planned system improvements" (see Section 10.4 for fee <br /> amount);plus <br /> 2. Responsibility for a fair share of cost of additional improvements, if any, to maintain <br /> acceptable levels of service as a result of the proposed project (see Table 2 and Section <br /> 10.2 for method of calculating the fair share). <br /> When Level of Service "D" or better will be met at the horizon year with the project, the <br /> applicant shall not be required to pay a fair share contribution for additional transportation <br /> -8- <br />