Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ICITY OF EVERETT SPECIAL PROVISIONS <br /> 1-08.11(2) Recording Changes <br /> IAs a minimum, record the following items on the record drawings: <br /> a. Actual dimensions, arrangement and materials used when different than shown <br /> I on the Plans. <br /> b. Changes made by Change Order or Field Order. <br /> c. Changes made by the Contractor. <br /> I d. Horizontal and vertical locations of underground utilities and appurtenances, <br /> shall be referenced to monumentation. The monumentation shall be based on <br /> NAD 83-91 for Horizontal Datum and NAVD 88 for Vertical Datum. <br /> I e. Any changes in centerline profile and curb & gutter (top of curb), offsets and <br /> elevations. <br /> f. Details, Equipment or materials used that were not shown on the original Plans. <br /> I g. The actual arrangement and routing of conduit, embedded conduit, raceways <br /> and piping relative to its location and proportioned to other work. The location <br /> needs to be dimensioned on the record drawings. <br /> I h. Contractor prepared piping schematics and diagram drawings representing the <br /> Equipment orientation. <br /> i. Final location of all surface and subsurface improvements. <br /> I j. Record on the drawings the location of all field run materials. <br /> k. All shoring systems left in place at the end of construction. <br /> Contractor shall accurately show existing underground items including, but not limited <br /> I to, piping, manholes, pull boxes, conduit, direct buried wire, foundations; equipment <br /> and obstructions found during construction on the record drawings. Note on the record <br /> drawings the actual size of all utilities and structures and types of material used. <br /> I Locate all record drawing items by survey coordinates or dimensioned off NAD 83-91 <br /> for Horizontal Datum and NAVD 88 for Vertical Datum. Minimum requirements for <br /> accuracy are specified in the following chart. <br /> tDescription Horizontal Elevation Notes <br /> Location <br /> Gravity sewer and Coordinates, I.E. 0.01 ft. Recalculate actual slopes. <br /> I drain lines stations, and All inverts in manholes. <br /> offsets 0.1 ft. All angle changes. <br /> Forcemains, Coordinates I.E. 0.1 ft. Record all angle points and <br /> I watermains and and stations finished ground elev. Above <br /> transmission lines 0.1 ft. the invert elev. <br /> All other items, incl. 0.1 ft. 0.1 ft. Show dimensions on record <br /> I , Electrical and drawings. <br /> Structural <br /> Use red pen or pencil to make changes on the record drawings. Notations are to be <br /> I neat, legible, clear and concise. <br /> Record information concurrently with the progress of construction. Conceal no work <br /> until the required information is verified and recorded. <br /> I <br /> I Water Main Replacement"Q" Division 1 -GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.-UP3612 SP -103 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.