Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 <br /> and fittings, and appurtenances; shoring; dewatering; furnishing, installing and compacting <br /> bedding and backfill materials; plastic film wrap; and thermoplastic powder coating required <br /> for the complete installation of the hydrant assembly as specified. <br /> Work and materials to be included with this bid item removal or salvage, handling and <br /> disposal of the existing hydrant and disposal of or abandoning in place pipe, fittings, and <br /> valve. <br /> Bid Item 23 - Hydrant Lead <br /> Measurement and Payment: Unit Price per Each (EA) M <br /> The unit price per each shall be full compensation for all work to furnish and install the pipe <br /> and gate valve from the main line to connect to the existing hydrant base in accordance <br /> with applicable portion of COE Standard Drawing No. 507 including, and not limited to, all <br /> costs for clearing and grubbing; excavation, removal, haul and disposal of excavated <br /> materials; furnishing, installing, testing, and disinfecting pipe, valves, fittings, and <br /> appurtenances; shoring; dewatering; furnishing, installing and compacting bedding and <br /> backfill materials; required for the complete installation of the hydrant lead specified. <br /> Bid Item 24 - Connection to Existing 6-inch Water Main <br /> Bid Item 25 - Connection to Existing 12-inch Water Main I <br /> Bid Item 26 - Connection to Existing 16-inch Water Main <br /> Measurement and Payment: Unit Price per Each (EA) I <br /> The unit contract price for Connection to Existing -inch Water Main shall constitute full <br /> compensation for all labor, materials, tools and equipment necessary for connection to <br /> existing system, in accordance with 7-09.3(19)A including, and not limited to; all costs for <br /> traffic control, excavation, shoring, dewatering, haul and disposal of excavated materials, <br /> furnishing, installing and compacting bedding and backfill materials; labor and equipment <br /> required for the complete installation of the connection as specified. <br /> Unit contract price shall include all coordination efforts with the City and assistance as City <br /> forces make the actual connection. Connection of a water service line to the water main <br /> and connection of new water service line to existing water service line will not be <br /> considered a connection to the existing system. <br /> Bid Item 27 - Corporation Stop w/ Service Saddle, 3/4-inch <br /> Bid Item 28 - Corporation Stop w/ Service Saddle, 1-inch I <br /> Measurement and Payment: Unit Price per Each (EA). <br /> The unit contract price for Corporation Stop w/ Service Saddle, -Inch shall constitute full <br /> compensation for all labor, materials, tools and equipment necessary for installation of a <br /> new corporation stop and service saddle in accordance with Parts A and B of COE <br /> Standard Drawing No. 502A or 502C as the case may be, including and not limited to, <br /> furnishing and installing the service saddle and corporation stop; trench excavation and <br /> dewatering, pavement removal, backfill and compaction; and testing the connection. <br /> Bid Item 29 - Service Saddle and Valve Assembly, 2-inch <br /> Measurement and Payment: Unit Price per Each (EA). <br /> The unit contract price for Service Saddle and Valve Assembly, -Inch shall constitute full <br /> compensation for all labor, materials, tools and equipment necessary for installation of a <br /> new corporation stop and service saddle in accordance with Parts A, B and L of COE <br /> Standard Drawing No. 502B, including and not limited to, furnishing and installing the <br /> Water Main Replacement"Q" Division B—BID DESCRIPTIONS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP-10 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.