CITY OF EVERETT SPECIAL PROVISIONS
<br /> service saddle and 2-inch gate valve and box; trench excavation and dewatering, pavement
<br /> removal, backfill and compaction; and testing the connection.
<br /> Bid Item 30 - Water Service, 3/4-inch
<br /> Bid Item 31 - Water Service, 1-inch
<br /> Bid Item 32 - Water Service, 2-inch
<br /> Measurement and Payment: Unit Price per Lineal Foot (LF).
<br /> The unit contract price for Water Service -inch, shall constitute full compensation for all
<br /> labor, materials, tools and equipment necessary for new service lines continuous and
<br /> unspliced from the new main to a new meter setter in accordance with Parts C-G of COE
<br /> Standard Drawing No. 502A or 502C as the case may be, or Parts D-G of COE Standard
<br /> Drawing No. 502B, including and not limited to, connecting to service connection saddle,
<br /> street pavement, concrete curb, concrete curb and gutter, concrete driveway, and concrete
<br /> sidewalk removal; furnishing, installing, and testing to corporation stop, valves, fittings, and
<br /> installation of service line, and appurtenances; providing a #10 copper tracer wire for
<br /> polyethylene pipe, compaction, connection to existing or new meter setter including fittings;
<br /> ' dewatering; testing; removal or abandonment of existing service connection.
<br /> Bid Item 33 - Water Service, 4-inch
<br /> Measurement and Payment: Unit Price per Each (EA)
<br /> IThe unit contract price for Water Service, 4-Inch, shall constitute full compensation for all
<br /> labor, materials, tools and equipment necessary for new 4-inch ductile iron service lines
<br /> from the tee on the new main to reconnecting with the existing 4-inch steel service line,
<br /> 1 including and not limited to, reducers; pipe installation; 4-inch heavy duty gate valve and
<br /> box; restrained joint fittings; trench excavation, backfill and compaction; street pavement,
<br /> concrete curb, concrete curb and gutter, concrete driveway and concrete sidewalk removal;
<br /> clearing and grubbing; testing; lawn restoration including seeding or sodding; connection to
<br /> existing service line including fittings and new pipe matching existing diameter and
<br /> material; dewatering; and removal or abandonment of existing service connection
<br /> 1 Bid Item 34 - Water Fire Service, 6-inch
<br /> Measurement and Payment: Unit Price per Each (EA)
<br /> The unit contract price for Water Fire Service, 6-inch, shall constitute full compensation for
<br /> all labor, materials, tools and equipment necessary for new 6-inch ductile iron service lines
<br /> from the tee on the new main to reconnecting with the existing service line, including and
<br /> not limited to, reducers; pipe installation; 6-inch heavy duty gate valve and box; restrained
<br /> joint fittings; trench excavation, backfill and compaction; street pavement, concrete curb,
<br /> concrete curb and gutter, concrete driveway and concrete sidewalk removal; clearing and
<br /> grubbing; testing; lawn restoration including seeding or sodding; connection to existing
<br /> service line including fittings and new pipe matching existing diameter and material;
<br /> dewatering; and removal or abandonment of existing service connection.
<br /> Bid Item 35 - Replace Water Meter Box, 3/4-inch
<br /> Measurement and Payment: Unit Price per Each (EA)
<br /> The unit contract price for Replace Water Meter Box, -inch, shall constitute full
<br /> compensation for all labor, materials, tools and equipment necessary for removing existing
<br /> water meter box and setter and installing new water meter box and setter conforming with
<br /> COE Standard Drawing No. 502A or 502C as the case may be for Parts H-K and with COE
<br /> Standard Drawing No. 502B for Parts H-K, including, and not limited to, excavation, backfill
<br /> Water Main Replacement"Q" Division B—BID DESCRIPTIONS July 8, 2016
<br /> -Broadway
<br /> WO No.—UP3612 SP -11
<br />
|