My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-02.3(7) Salvage <br /> Carefully salvage and deliver to the Owner in good condition, all materials of <br /> ' recoverable value taken from the discarded facilities. unless otherwise indicated. <br /> Materials and things deemed of no value by the Engineer shall become the <br /> Contractor's property to be removed and properly disposed. <br /> Remove excess concrete, debris and dirt from castings and other materials the <br /> Engineer designates suitable for salvage and that are not to be re-used elsewhere on <br /> the Project. Deliver salvage castings and materials to the location designated by the <br /> Engineer. <br /> ' 2-02.3(8) Waste Disposal <br /> (******) <br /> ' Provide waste site for disposal of materials not required for construction. Arrange <br /> waste disposal at no expense to the City. Waste disposal shall meet the requirements <br /> of 2-03.3(7)C of the Standard Specifications. <br /> 2-02.3(9) Abandon Existing Water Valves In-place <br /> (******) <br /> Prior to abandoning existing water valves in-place, coordinate with City to have City <br /> forces close valve. After City forces verify valve is closed, remove valve box and <br /> ' extension, if any, and backfill with Gravel Borrow as specified in 9-03.14(1). Compact <br /> backfill to a minimum of 95 percent maximum density in accordance with 2-03.3(14)D. <br /> 2-02.4 Measurement <br /> ' Delete the first paragraph of 2-02.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> ' described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> For curb and gutter cement removal with concrete pavement, the curb and gutter will <br /> be considered as pavement removal and the measurement for payment will be to the <br /> ' back of the curb. <br /> 2-02.5 Payment <br /> ' Delete all paragraphs in 2-02.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Include pavement, curb and gutter, and sidewalk removals with the construction of the <br /> water main, water service line, and hydrant lead work with no direct compensation <br /> being made. <br /> Include pipe abandonment with the construction of the respective water main, water <br /> service and hydrant lead work with no direct compensation being made. <br /> ' Include existing valve abandonment with the construction of respective water main, <br /> water service and hydrant lead work with no direct compensation made. <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT <br /> 2-03.1 Description <br /> Supplement 2-03.1 by adding the following: <br /> This Work applies to street pavement patching and street reconstruction after <br /> completion of utility work. Grading for street reconstruction shall conform to COE <br /> Water Main Replacement"Cr Division 2-EARTHWORK July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP -131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.