My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' incurred. If Contractor fails to promptly reimburse City then City will deduct cost, plus <br /> interest on unpaid balance, from Contractor's final payment. <br /> 2-08.2 Vacant <br /> U <br /> 2-08.3 Construction Requirements <br /> Provide self-propelled pickup sweepers equipped with water spray systems for dust control <br /> for pavement cleaning and debris removal as required. The use of supplementary water to <br /> ' suppress dust while performing cleaning Work shall be held to a minimum unless <br /> designated otherwise by the Engineer. <br /> The type and di ember of sweepers are subject to the approval of the Engineer. <br /> ' Plan construction operation to minimize the need for street cleaning. <br /> 2-08.4 Measurement <br /> ' Delete all paragraphs of 2-08.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> ' 2-08.5 Payment <br /> Delete all paragraphs in 2-08.5 and substitute the following:. <br /> ' Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-09 STRUCTURE EXCAVATION <br /> 2-09.2 Materials <br /> Supplement 2-09.2 by adding the following at end of the materials list: <br /> ' Foundation Material Class A or B 9-03.17 Standard Specifications <br /> Sand Backfill for Pipe Zone 9-02.22 Special Provisions <br /> ' 2-09.3 Construction Requirements <br /> 2-09.3(1) General Requirements <br /> 2-09.3(1)C Removal of Unstable Base Material <br /> ' Delete all paragraphs in 2-09.3(1)C and substitute the following: <br /> When the material at the bottom of an excavation is not stable enough to <br /> support the Structure, the Contractor shall excavate below grade to the depth <br /> ' not to exceed a depth of 12 inches or as required by the Engineer and <br /> replace the unstable material with Foundation Material Class A or B. <br /> Place Foundation Material Class A or B in layers not more than six inches <br /> ' thick and compact to minimum of 90-percent maximum density as determined <br /> by 2-03.3(14)D. <br /> Dispose of unsuitable material removed to make room for foundation material <br /> ' by hauling to a waste site obtained and provided by the Contractor in <br /> accordance with 2-03.3(7)C. <br /> 2-09.3(1)D Disposal of Excavated Material <br /> ' Delete the second paragraph in 2-09.3(1)D and substitute the following: <br /> Include all costs for disposing of excavated material, whether within the <br /> Project limits or hauled to a disposal site, with other Bid items in the Proposal. <br /> Water Main Replacement"Q" Division 2 -EARTHWORK July 8, 2016 <br /> -Broadway <br /> WO No.-UP3612 SP-135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.