My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> There will be no direct compensation made for hauling and disposal. ' <br /> Disposal of excavated material shall meet the requirements of 2-03.3(7)C. <br /> 2-09.3(1)E Backfilling <br /> Delete the fourth paragraph in 2-09.3(1)E and substitute the following: <br /> Provide CDF having minimum 28-day strength of 50 psi and maximum 28-day <br /> strength not to exceed 300-psi. Provide wet or flowable CDF with <br /> consistency having approximate slump between three to ten inches. <br /> Controlled Density Fill used for excavation backfill may be placed dry or wet. <br /> Use wet, or flowable, CDF for filling abandoned pipes in-place. <br /> Supplement 2-09.3(1)E by adding the following: <br /> Where CDF is used in lieu of other materials such as foundation material, <br /> gravel borrow, washed sand or crushed surfacing top course, the respective <br /> limits for trench width or backfill dimensions shall be approved by the <br /> Inspector. <br /> 2-09.4 Measurement <br /> Delete all paragraphs in 2-09.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-09.5 Payment <br /> Delete all paragraphs in 2-09.5 and substitute the following: ' <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> When there is no bid item for "Structure Excavation" in the Proposal, all Work in this <br /> section shall be included with the respective Bid Items of the Contract with no direct <br /> compensation made. <br /> 2-11 TRIMMING AND CLEANUP <br /> 2-11.3 Construction Requirements <br /> Supplement 2-11.3 by adding the following after item 6: <br /> 7. Keep City streets clean and free from mud, dirt and other debris. <br /> Further supplement 2-11.3 by adding the following: <br /> Keep the Project site in a neat and orderly condition during the process of construction <br /> with as little disruption to the adjoining properties as practical under the conditions. <br /> Promptly and as often as needed cleanup debris resulting from Contractor's operations <br /> from drainage facilities such as inlets, catch basins, culverts and open ditches. <br /> Remove and dispose of all construction stakes. <br /> Upon Project completion, clean Project area and neatly dress slopes to present a <br /> uniform appearance blending into the contour of adjacent properties. Remove trash of <br /> all kinds resulting from construction operations. <br /> 2-11.4 Measurement <br /> Delete all paragraphs in 2-11.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> Water Main Replacement"Q" Division 2-EARTHWORK July 8, 2016 <br /> - Broadway <br /> WO No.—UP3612 SP-136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.