My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' DIVISION 5 — SURFACE TREATMENTS AND PAVEMENTS <br /> 5-04 HOT MIX ASPHALT <br /> 5-04.3 Construction Requirements <br /> 5-04.3(3) Hot Mix Asphalt Pavers <br /> 5-04.3(3)A Material Transfer Device / Vehicle <br /> Supplement the first paragraph with the following: <br /> Additionally. a material transfer device or vehicle (MTD/V) is not required. <br /> 5-04.3(7) Preparation of Aggregates <br /> 5-04.3(7)A2 Statistical or Nonstatistical Evaluation <br /> Delete 5-04.3(7)A2 and substitute the following; <br /> 5-04.3(7)A2 Nonstatistical Evaluation <br /> Mix designs for HMA accepted by Nonstatistical evaluation shall; <br /> ' 1. Be submitted to the Project Engineer on WSDOT Form 350-042. <br /> 2. Have the aggregate structure and asphalt binder content <br /> determined in accordance with WSDOT Standard Operating <br /> Procedure 732 and meet the requirements of Sections 9-03.8(2) <br /> and 9-03.8(6). <br /> 3. Have anti-strip requirements, if any, for the proposed mix design <br /> determined in accordance with WSDOT Test Method T 718 or <br /> based on historic anti-strip and aggregate source compatibility <br /> from WSDOT lab testing. Anti strip evaluation of HMA mix <br /> designs utilized that include RAP will be completed without the <br /> inclusion of the RAP. <br /> At or prior to the preconstruction meeting, the contractor shall provide <br /> one of the following mix design verification certifications for City review; <br /> 1. The proposed mix design indicated on a WSDOT mix <br /> design/anti-strip report that is within one year of the approval <br /> date. <br /> 2. The proposed HMA mix design submittal (Form 350-042) with <br /> the seal and certification (stamp & signature) of a valid licensed <br /> Washington State Professional Engineer. <br /> ' 3. The proposed mix design by a qualified City or County laboratory <br /> mix design report that is within one year of the approval date. <br /> The mix design will be performed by a lab accredited by a national <br /> authority such as Laboratory Accreditation Bureau, L-A-B for <br /> Construction Materials Testing, The Construction Materials Engineering <br /> Council (CMEC's) ISO 17025 or AASHTO Accreditation Program (AAP) <br /> and shall supply evidence of participation in the AASHTO Material <br /> Reference Laboratory (AMRL) program. <br /> At the discretion of the Engineer, agencies may accept mix designs <br /> verified beyond the one year verification period with a certification from <br /> the Contractor that the materials and sources are the same as those <br /> shown on the original mix design. <br /> ' No paving shall begin prior to City approval of the Contractor provided <br /> mix design. <br /> Water Main Replacement Q Division 5—SURFACE TREATMENTS July 8, 2016 <br /> -Broadway AND PAVEMENTS <br /> WO No.—UP3612 SP -141 <br />
The URL can be used to link to this page
Your browser does not support the video tag.