My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 5-04.3(8)A1 General ' <br /> Delete all five paragraphs in 5-04.3(3)A1 and substitute the following: <br /> Acceptance of HMA shall be as defined under nonstatistical or commercial <br /> evaluation. <br /> Nonstatistical evaluation will be used for all HMA not designated as <br /> Commercial HMA in the contract documents. <br /> The mix design will be the initial JMF for the class of HMA. The Contractor <br /> may request a change in the JMF. Any adjustments to the JMF will require <br /> the approval of the Project Engineer and must be made in accordance with <br /> Section 9-03.8(7). <br /> Commercial evaluation may be used for Commercial HMA and for other <br /> classes of HMA in the following applications: sidewalks, road approaches, <br /> ditches, slopes, paths, trails, gores, prelevel, and pavement repair. Other <br /> nonstructural applications of HMA accepted by commercial evaluation shall <br /> be as approved by the Project Engineer. Sampling and testing of HMA <br /> accepted by commercial evaluation will be at the option of the Project <br /> Engineer. Commercial HMA can be accepted by a contractor certificate of <br /> compliance letter stating the material meets the HMA requirements defined in <br /> the contract <br /> 5-04.3(8)A4 Definition of Sampling Lot and Sublot <br /> Supplement 5-04.3(8)A4 with the following: <br /> For HMA in a structural application, sampling and testing for total project <br /> quantities less than 400 tons is at the discretion of the City Inspector. For <br /> HMA used in a structural application and with a total project quantity less <br /> than 800 tons but more than 400 tons, a minimum of one acceptance test <br /> shall be performed: <br /> 1. If test results are found to be within specification requirements, <br /> additional testing will be at the City Inspector's discretion. <br /> 2. If test results are found not to be within specification <br /> requirements, additional testing as needed to determine a CPF <br /> shall be performed. <br /> 5-04.3(8)A5 Test Results <br /> Delete the first paragraph of 5.04.3(8)A5. <br /> 5-04.3(8)A6 Test Methods <br /> Delete the paragraph in 5-04.3(8)A6 and substitute the following; <br /> Testing of HMA for compliance of Va will be at the option of the City. If <br /> tested, compliance of Va will be use WSDOT Standard Operating <br /> Procedure SOP 731. Testing for compliance of asphalt binder content will <br /> be by WSDOT FOP for AASHTO T 308. Testing for compliance of <br /> gradation will be by WAQTC FOP for AASHTO T 27/T 11. <br /> 5-04.4 Measurement <br /> Delete all paragraphs of 5-04.4 and substitute the following: I <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. I <br /> Water Main Replacement Q Division 5—SURFACE TREATMENTS July 8, 2016 <br /> -Broadway AND PAVEMENTS <br /> WO No.—UP3612 SP -142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.