Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1 7-08.3(2) Laying Pipe <br /> 7-08.3(2)A Survey Line and Grade <br /> Delete both paragraphs of 7-08.3(2)A and substitute the following: <br /> Provide surveys required to construct the sewer line including, but not limited <br /> to, alignment stakes, offset stakes, grade hubs, and intermediate staking. <br /> Use main survey control points shown on the Plans, unless Engineer directs <br /> otherwise. If a Bid item for "Surveying" is not listed in the Proposal, then this <br /> item shall be included with the Work with no direct compensation made. <br /> Provide laser control equipment approved by the Engineer for setting pipe <br /> grades. <br /> 7-08.3(3) Backfilling <br /> Delete the first paragraph of 7-08.3(3) and substitute the following: <br /> Perform trench backfilling only after inspection and approval of the installed pipe <br /> bedding zone backfill. Refer to COE Standard Drawing No. 610, 611, 615 and the <br /> Plans for typical trench section backfill and compaction requirements, unless <br /> otherwise noted on the Plans. <br /> If the Engineer determines native material is not suitable for use as trench backfill, <br /> use "Gravel Borrow" conforming to 9-03.14(1) of the Standard Specifications. <br /> If there is an excess of suitable backfill material obtained from trench excavation <br /> at one location on the project.. use it at other locations on the project or dispose of <br /> at an approved disposal site. The cost of transporting the excess backfill material <br /> is considered incidental to the Contract with no direct compensation made. <br /> Use Controlled Density Fill in lieu of select trench backfill for fill above pipe zone <br /> at street crossings and as directed by the Engineer in other areas where in order <br /> to prevent pavement patch settlementis requires high density backfill placement or <br /> I effective backfill compaction not possible. <br /> Delete the first sentence of the third paragraph. <br /> Delete the third and fourth sentences of the fourth paragraph. <br /> ' 7-08.3(4) Plugging Existing Pipe <br /> Delete the first paragraph of 7-08.3(4) and substitute the following: <br /> Where shown on the plans to plug and seal existing water main. sanitary sewer <br /> and storm drainage pipe plug existing pipe a minimum distance of 2-feet from the <br /> inlet end with cement grout and abandon in place. <br /> 7-08.4 Measurement <br /> Delete all paragraphs in 7-08.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-08.5 Payment <br /> Delete all paragraphs in 7-08.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> ' Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> I <br /> Water Main Replacement"Q" Division 7—WATER MAIN July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP - 149 <br />