Laserfiche WebLink
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 7-09 WATER MAINS <br /> 7-09.1 Description I <br /> Revise the first paragraph in 7-09.1 to read as follows: <br /> This Work consists of constructing water mains in accordance with the Plans, the <br /> Standard Specifications, these Special Provisions and the COE Standard Drawings, at <br /> the location shown on the Plans. <br /> 7-09.1(1) Definitions <br /> 7-09.1(1)D Pipe Zone Backfill <br /> Revise the first paragraph in 7-09.1(1)D to read as follows: <br /> Pipe zone backfill includes material placed a minimum of 6-inches below the <br /> bottom of pipe up to a minimum of 12-inches above the top of pipe as shown <br /> on COE Standard Drawing No. 615. <br /> Supplement 7-09.1 as follows: <br /> 111 <br /> 7-09.1(2) Submittals <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. ' <br /> 7-09.2 Materials <br /> Substitute the following for the corresponding material in the material list in 7-09.2: <br /> Ductile Iron Pipe for main line 9-30.1(1) Special Provisions <br /> Restrained Joints 9-30.2(6) Special Provisions <br /> Bolted, Sleeve—Type Couplings 9-30.2(7) Special Provisions <br /> for Plain End Pipe <br /> Restrained Flexible Couplings 9-30.2(8) Special Provisions <br /> Aggregates: <br /> Foundation Material 9-03.17 Standard Specifications <br /> Crushed Surfacing Base 9-03.9(3) Standard Specifications <br /> Course for Pipe Zone Bedding <br /> Pipe Zone Backfill 9-03.12(3) Standard Specifications <br /> Trench Backfill 9-03.14(1) Standard Specifications & <br /> 9-03.15 Standard Specifications <br /> Controlled Density Fill 2.09.3(1)E Special Provisions <br /> 7-09.3 Construction Requirements <br /> 7-09.3(5) Grade and Alignment <br /> Revise the first sentence of the third paragraph in 7-09.3(5) to read as follows: <br /> Provide minimum cover from the final surface grade to the top of the pipe of 36- <br /> inches for water mains less than 12-inches in diameter and 48-inches for water <br /> mains 12-inches or greater in diameter. Provide 60-inches as the maximum depth <br /> from the final surface grade to the top of all water main pipes. Adhere to both <br /> minimum and maximum depths from finish grades unless Plans indicate <br /> otherwise. <br /> 7-09.3(7) Trench Excavation <br /> Revise the second paragraph in 7-09.3(7) to read as follows: <br /> Excavate bell holes to the extent necessary to permit accurate Work in making <br /> and inspecting the joints. Keep the banks of the trenches as nearly vertical as soil <br /> conditions will permit, and where required to control trench width or to protect <br /> adjacent Structures, sheet and brace the trench. Provide trench widths to 1 foot <br /> Water Main Replacement"Q" Division 7—WATER MAIN July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP- 150 <br />