My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> IBid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> I <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-09.5 Payment <br /> Delete all paragraphs of 7-09.5 and substitute the following: <br /> I Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 1 7-12 VALVES FOR WATER MAINS <br /> 7-12.1 Description <br /> I <br /> Supplement 7-12.1 as follows: <br /> 7-12.1(1) Submittals <br /> (******) <br /> IProvide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-12.2 Materials <br /> ' Delete the first paragraph in 7-12.2 and substitute the following <br /> Provide materials meeting the requirements of the following: <br /> Gate Valves (2-inches to 12-inches) 9-30.3(1) Special Provisions <br /> I Butterfly Valves <br /> 9-30.3(3) Special Provisions <br /> Valve Boxes 9 30.3(4} Special Provisions <br /> Valve Stem Extensions 9-30.3(6) Special Provisions <br /> I <br /> Combination Air Release/Air Vacuum 9-30.3(7) Standard Specifications <br /> Valves <br /> End Connections 9.30.5(1) Standard Specifications <br /> I <br /> 7-12.3 Construction Requirements <br /> Supplement 7-12.3 by adding the following: <br /> Install valve box centered on the operator nut. <br /> IProvide 3-inch thick x 2-feet x 2-feet HMA concrete pad around valve boxes located <br /> within gravel surface. <br /> I <br /> Provide one valve stem extension, minimum 12-inch length, in accordance with COE <br /> Standard Drawing No. 504 when the top of the valve operating nut is more than three <br /> feet below finished grade. <br /> I <br /> Provide equipment, labor, tools, materials and miscellaneous parts to perform <br /> pavement sawing, pavement removal; excavations, shoring, traffic control and other <br /> Work required to prepare the site for City Utility Department personnel to install the <br /> I City supplied tapping sleeve and valve assembly. <br /> Notify City Utility Department a minimum of five business days for each hot tap being <br /> made. The Utility Department will determine the date and time to make each hot tap. <br /> I <br /> Expose the water main being hot tapped, including properly shoring the excavation in <br /> accordance with requirements of WISHA, RCW 49.17 including WAC 296-155. Should <br /> City personnel determine the excavation and shoring do not meet the requirements of <br /> I <br /> WISHA, RCW 49.17, including WAC 296-155, City personnel will notify Contractor to <br /> make necessary modifications to bring the excavation and shoring into compliance <br /> prior to City personnel entering the trench. <br /> I Once the conditions are deemed safe for City personnel to enter the trench, City will <br /> install the tapping sleeve and valve assembly and Utility Department personnel will <br /> Water Main Replacement"Q" Division 7—WATER MAIN July 8, 2016 <br /> I -Broadway <br /> WO No.—UP3612 SP -157 <br />
The URL can be used to link to this page
Your browser does not support the video tag.