Laserfiche WebLink
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> perform the hot tapping of the existing main. Upon City Utility Department personnel <br /> completing installing and testing the tapping sleeve and valve assembly. City Utility <br /> Department personnel will connect to Contractor's installed pipe upon Contractor's <br /> successful completion and testing of Contractor installed water main. Backfill, <br /> compact, and restore the area. <br /> Where shown on the Plans, adjust existing valve boxes and covers to the grade as <br /> staked or otherwise designated by the Engineer. Using riser rings to adjust the valve <br /> box to grade is not allowed. <br /> Conduct removal operations conducted to prevent damage to the valve boxes. <br /> Replace parts or materials damaged due to the Contractor's operations at his expense. <br /> Conduct valve box adjustments so the final adjusted valve box allows full operation of <br /> the valve. Remove debris from the adjusted valve boxes to ensure full valve operation. <br /> 7-12.4 Measurement <br /> Delete all paragraphs of 7-12.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. , <br /> 7-12.5 Payment <br /> Delete all paragraphs of 7-12.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-14 HYDRANTS <br /> 7-14.1 Description <br /> Supplement 7-14.1 as follows: , <br /> 7-14.1(1) Submittals <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. 1 <br /> 7-14.2 Materials <br /> Delete the material list in 7-14.2 and substitute the following: <br /> Provide materials meeting the requirements of the following: <br /> Hydrants 9-30.5 Special Provisions <br /> 7-14.3 Construction Requirements , <br /> 7-14.3(1) Setting Hydrants <br /> Delete the first and second paragraphs in 7-14.3(1) and substitute the following: <br /> Provide fire hydrant assemblies in accordance with City of Everett Standard <br /> Drawing No. 507, 509, and 510. <br /> Revise the first sentence of the fourth paragraph to read as follows: <br /> Paint hydrants in accordance with Part L in COE Standard Drawing No. 507. <br /> Supplement 7-14.3(1) as follows: <br /> Consider a hydrant in service when it is installed in working order in accordance <br /> with the Plans and Specifications. <br /> 7-14.3(2) Hydrant Connections <br /> Delete the first paragraph in 7-14.3(2) and substitute the following: <br /> Water Main Replacement"Q" Division 7—WATER MAIN July 8, 2016 <br /> -Broadway <br /> WO No. —UP3612 SP - 158 <br />