Laserfiche WebLink
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Provide materials meeting the requirements of the following sections: <br /> Saddles 9-30.6(1) Special Provisions <br /> Corporation Stops 9-30.6(2) Special Provisions <br /> Service Pipe 9-30.6(3) Special Provisions <br /> Service Fittings 9-30.6(4) Special Provisions <br /> Meter Setters 9-30.6(5) Special Provisions <br /> Meter Boxes 9-30.6(7) Special Provisions <br /> Brass Nipples and 9-30.6(8) Special Provisions <br /> Fittings <br /> 7-15.3 Construction Requirements <br /> Revise the first paragraph in 7-15.3 to read as follows: <br /> Provide new service connections to new water mains using specified saddles of the <br /> size and type suitable for use with the service pipe being installed. Install new service <br /> connection piping from the main to the meter box as shown on the Plans and directed <br /> by the City Inspector. Install service connection piping perpendicular to the main, <br /> unless shown otherwise on the Plans or directed by the City Inspector. <br /> Revise the first sentence of the second paragraph in 7-15.3 to read as follows: <br /> Provide trench depth adequate to maintain a minimum of 30-inches of cover over the <br /> top of the connecting service pipe. <br /> Supplement 7-15.3 by adding the following: ' <br /> Provide service connections to water mains in accordance with COE Standard <br /> Drawings No. 502A, 502B and 502C as applicable. <br /> Field verify actual service connection location, size and material as existing service , <br /> information and locations shown on the Plans may not be accurate since this <br /> information is taken from existing records. Match the service size of the existing <br /> service connection with the minimum service size being 3/4-inch. Should the planned ' <br /> location require moving after verifying actual service connection in field, City Inspector <br /> and the City Utility Department personnel will make final decision as to its relocation. <br /> Replace existing services from the main to the property line, including the meter box ' <br /> and meter setting if noted on the Plans. <br /> Bore service connection lines, regardless of size, under pavement section, curbs and <br /> sidewalks where soil conditions and other existing buried utilities allow. The City <br /> inspector will allow open-cut trench installation across pavement section, curbs and <br /> sidewalks only where soil conditions prohibit boring. Open—cut lawn areas and other <br /> non-pavement areas for service installation unless City Inspector directs otherwise. <br /> The City Inspector may, at the Contractor's request, allow tunneling under curb and <br /> sidewalk as long as it appears no structural damage will be done to curb or sidewalk <br /> as a result of the tunneling operations. Regardless of the method used, the Contractor <br /> shall maintain a minimum of 30-inch cover over the service connection line. Where <br /> open cut trench installation is allowed, keep the trench width to 24-inches or less. <br /> Provide Controlled Density Fill for the full depth of backfill when open cutting streets. <br /> At existing metered services noted for removal or replacement on the Plans, salvage <br /> existing meter and stockpile on-site at location approved by City Inspector. Notify City <br /> Inspector 24-hours prior to removal to allow City Inspector to document the meter <br /> number and address of meter being removed. Remove and dispose of existing meter <br /> box, meter setter, fittings and service piping. Where existing metered services are not <br /> being replaced, backfill with native soil, compact and restore the surface to match <br /> existing condition. <br /> Water Main Replacement"Q" Division 7—WATER MAIN July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP-160 <br />