My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Provide continuous 6-inch diameter ductile iron pipe from the auxiliary gate valve <br /> at the main to the hydrant in accordance with COE Standard Drawing 507. <br /> ' Provide mechanical joint restraining glands conforming to 9-30.2(6) of these <br /> Special Provisions. <br /> 7-14.3(2)A Hydrant Restraints <br /> Revise the first paragraph in 7-14.3(2)A to read as follows: <br /> Restrain thrust created in short hydrant laterals of one pipe length or less <br /> ' using mechanical retainer glands at the auxiliary valve and hydrant fittings as <br /> shown in the COE Standard Drawing No. 507. For longer hydrant leads <br /> requiring two or more pipe lengths, Contractor may use field lock gaskets in <br /> lieu of mechanical joint restraint system to restrain the number of pipe joints <br /> between the auxiliary valve and the hydrant. <br /> 7-14.3(2)B Auxiliary Gate Valves and Valve Boxes <br /> Revise the first paragraph in 7-14.3(2)B to read as follows: <br /> Provide auxiliary gate valves and valve boxes in accordance with Section 7- <br /> 12 and COE Standard Drawing No. 507. <br /> 7-14.3(3) Reconnecting Existing Hydrants <br /> Revise the second paragraph in 7-14.3(5) to read as follows: <br /> Use mechanical retainer glands to restrain new hydrant lateral connection to <br /> ' hydrant fitting. <br /> 7-14.4 Measurement <br /> ' Delete all paragraphs of 7-14.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> ' Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-14.5 Payment <br /> Delete all paragraphs of 7-14.5 and substitute the following: <br /> ' Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-15 SERVICE CONNECTIONS <br /> 7-15.1 Description <br /> ' Delete the first paragraph of 7-15.1 and substitute the following: <br /> This Work consists of installing residential and commercial service connections from <br /> the main to the private line for the premises served. Include the meter box and meter <br /> ' setter for existing non-metered services. Include replacing existing meter boxes and <br /> meter setters as noted on the Plans and as directed by the Engineer. <br /> Work also includes abandoning existing service connection and service connection <br /> ' pipe in-place. <br /> Supplement 7-15.1 as follows: <br /> 7-15.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-15.2 Materials <br /> Delete first paragraph and material list of 7-15.2 and substitute the following: <br /> Water Main Replacement"Q" Division 7—WATER MAIN July 8, 2016 <br /> ' -Broadway <br /> WO No.—UP3612 SP -159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.