Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' DIVISION 8 - MISCELLANEOUS CONSTRUCTION <br /> 8-01 EROSION CONTROL <br /> ' 8-01.1 Description <br /> Revise the first paragraph in 8-01.1 to read as follows: <br /> This Work consists of furnishing, installing, maintaining. removing and disposing of <br /> ' high visibility fence, and water pollution and erosion control items in accordance with <br /> the Standard Specifications, these Special Provisions, as shown in the Plans, as <br /> shown on COE Standard Drawings, or as designated by the Engineer. <br /> 8-01.3 Construction Requirements <br /> 8-01.3(2) Seeding, Fertilizing, and Mulching <br /> 8-01.3(2)A Preparation For Application <br /> ' Revise the third sentence in the first paragraph in 8-01.3(2)A to read as follows: <br /> Cultivate seeding restoration areas no sooner than 1-week prior to seeding. <br /> Supplement 8-01.3(2)A by adding the following: <br /> Cultivate areas being restored to a depth of 4-inches. <br /> 8-01.3(2)B Seeding and Fertilizing <br /> ' Supplement 8-01.3(2)B by adding the following: <br /> Use Seed Mix #1, as specified in 9-14.2 of these Special Provisions in <br /> restoring areas not having established lawns. Use Seed Mix #2 or #3, as <br /> specified in 9-14.2 of these Special Provisions, for restoring areas with <br /> ' established lawns. <br /> Apply permanent seed mixture #1 and #2 uniformly over the areas being <br /> ' restored at a rate of 4-pounds per 1,000 square feet. <br /> Apply permanent seed mixture #3 uniformly over the areas being restored at <br /> a rate of 7-pounds per 1,000 square feet. <br /> Apply temporary seed mixture uniformly over the areas being restored at a <br /> rate of 2-pounds per 1,000 square feet. <br /> Apply fertilizer at a rate of 12 pounds per 1,000 square feet. <br /> ' 8-01.3(2)C Seeding and Fertilizing <br /> Supplement 8-01.3(2)C by adding the following: <br /> No liming application is required. <br /> 8-01.3(2)D Mulching <br /> Supplement 8-01.3(2)D by adding the following: <br /> Apply wood cellulose fiber at the rate of 60 pounds per 1,000 square feet. <br /> 8-01.3(9) Sediment Control Barriers <br /> 8-01.3(9)A Silt Fence <br /> Delete the fifth paragraph in 8-01.3(9)A and substitute the following: <br /> Provide steel posts consisting of U, T, L or C shape posts with a minimum <br /> weight of 1.35 lbs/ft, or other steel posts having equivalent strength and <br /> bending resistance to the posts listed. Provide silt fence conforming to COE <br /> Standard Drawing No. 214. <br /> 8-01.4 Measurement <br /> Delete all paragraphs in 8-01.4 and substitute the following: <br /> Water Main Replacement"Q" Division 8—MISC CONSTRUCTION July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP -163 <br />