Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS , <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 8-01.5 Payment <br /> Delete all paragraphs in 8-01.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 8-02 ROADSIDE RESTORATION <br /> 8-02.3 Construction Requirements , <br /> 8-02.3(16) Lawn Installation <br /> 8-02.3(16)A Lawn Installation <br /> Delete 8-02.3(16)A and substitute the following: <br /> 8-02.3(16)A Lawn Installation — Sod <br /> Install sod in irrigated areas only after the irrigation system is fully operational. <br /> Unless the Engineer approves otherwise, install sod between March 1 and <br /> October 1. Place sod strips within 48-hours of being cut. Place strips without <br /> voids and stagger the end joints. Roll sod with a smooth roller following <br /> placement to ensure good contact with the soil. <br /> During the establishment period, erect barriers, with warning signs where <br /> necessary, to preclude pedestrian traffic over the newly placed sod. <br /> Prepare areas for sod in accordance with standard horticultural practices as <br /> follows: <br /> 1. Rototill, or otherwise cultivate, to a minimum depth of 4-inches into the <br /> ground surface. Thoroughly incorporate a 10-2-10 fertilizer in the <br /> rototilling process at a rate of 4 pounds of available Nitrogen per 1000 <br /> square feet. <br /> 2. Rake the surface to even grade without low spots to trap water and round <br /> surface to match surroundings. <br /> 3. Add topsoil as required by the design. <br /> NOTE: Topsoil will be paid for separately if required. <br /> 4. Lightly dampen and compact the finished grade. <br /> 5. Install sod taking care to butt each piece tightly against the adjacent one. <br /> Stagger butt joints. Lay sod on sloped areas with the long dimension <br /> parallel to the toe or top of slope. After placing, roll the sod and sprinkle <br /> heavily with water. <br /> 6. Provide tools specially designed for the work and satisfactory to the <br /> Engineer. <br /> 7. Water and fertilize the sod during the 90 days establishment period. <br /> Schedule watering to prevent joints from drying between sod strips. <br /> Apply 6-2-4 fertilizer at 6 week intervals at the rate of 1 to 1-1/2 pounds <br /> of available Nitrogen per 1,000 square feet per application. <br /> Where Shown that sod is to be replaced, the work shall consist of the removal and <br /> replacement of existing lawn turf by cutting the sod to be removed into convenient <br /> sized squares or strips to uniform thickness, piling and storing in a dampened <br /> condition, and finally replacing the sod in its original position. This work will be <br /> performed where the special provisions provide for such work. <br /> Water Main Replacement"Q" Division 8—MISC CONSTRUCTION July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP -164 <br />