My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Provide Cement Concrete Driveway Type 1; 2 or 3 as the case may be in accordance <br /> ' with the Standard Specifications and Standard Plan No. 307, 308 and 309. Where <br /> driveways with depressed sidewalk are called for on the Plans, depress the sidewalk <br /> through the driveway area, providing a maximum 2 percent slope from back of <br /> ' sidewalk to the back of curb. Provide minimum six inch thick cement concrete <br /> driveways and sidewalk driveway approaches and construct using Commercial <br /> Concrete as specified in Section 6-02.3(2)B of the Standard Specifications. Provide <br /> concrete having a slump not exceeding 3-1/2-inches and having a minimum 28-day <br /> design strength of 4000 psi. Match concrete finishing for transitions to existing cement <br /> concrete driveways to the existing surface as closely as possible. <br /> Sawcut existing cement concrete driveways and butt joint the new pavement to the <br /> 1 existing driveway. <br /> Prepare subgrade for driveways and having required compaction and providing a firm, <br /> unyielding subgrade acceptable to the Engineer. <br /> ' Provide forms for the straight sections of the driveway having a minimum thickness of <br /> three inches and equal to the nominal depth of the concrete. Plywood or one inch <br /> lumber may be used on radii. Securely stake and block all forms to true line and <br /> ' grade. <br /> Protect the driveway against damage or defacement until acceptance by Owner. <br /> Remove and replace by the Contractor at his expense driveways that are not <br /> ' acceptable, in the opinion of the Engineer, because of damage or defacement. <br /> Before placing any concrete, have on the job site enough protective paper, or <br /> equivalent, to cover the pour of an entire day in the event of rain or other unsuitable <br /> ' weather conditions. <br /> 8-06.4 Measurement <br /> Delete paragraphs in 8-06.4 and substitute the following: <br /> ' Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-06.5 Payment <br /> Delete all paragraphs in 8-06.5 and substitute the following: <br /> ' Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> ' 8-14 CEMENT CONCRETE SIDEWALKS <br /> 8-14.2 Materials <br /> Supplement 8-14.2 by adding the following: <br /> Chemical Admixtures for Concrete 9-23.6 Special Provisions <br /> 8-14.3 Construction Requirements <br /> Supplement 8-14.3 by adding the following: <br /> Provide concrete mix with slump not exceeding 3-1/2 inches. <br /> Add coloring agent for matching the color of newly constructed cement concrete <br /> ' sidewalks to the color of adjacent existing cement concrete sidewalks. Add to the <br /> concrete during mixing in an amount not to exceed 1-1/2 pounds per cubic yard of <br /> concrete. Do NOT use coloring agent in curb ramps. <br /> Water Main Replacement"Q" Division 8-MISC CONSTRUCTION July 8, 2016 <br /> -Broadway <br /> WO No.-UP3612 SP -167 <br />
The URL can be used to link to this page
Your browser does not support the video tag.