Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> The top surface of the finished concrete shall not deviate more than 1/8-inch as <br /> measured using a 10-foot straight edge. <br /> The curb alignment shall not vary more than 1/4-inch as measured using a 10-foot <br /> straight edge. <br /> Depress the cement concrete curb at locations shown on the Plans, or as directed <br /> by the Engineer, for concrete curb ramps and driveways, in accordance with COE <br /> Standard Drawings No. 306A, 310A, 310B, 310C, 310D and 311. <br /> Construct cement concrete curbs where shown on the Plans, or as directed by the <br /> Engineer, in accordance with COE Standard Drawing Nos. 305A, 305B and 3050. <br /> Construct storm drainage frames and grates into cement concrete curb and gutter <br /> at locations shown on the Plans in accordance with COE Standard Drawings Nos. <br /> 407 and 408. <br /> After finishing, spray cement concrete curb, gutters and spillways using <br /> transparent curing compound in accordance with 5-05.3(13)A of the Standard <br /> Specifications. <br /> 8-04.3(1)A Extruded Cement Concrete Curb <br /> Supplement 8-04.3(1)A by adding the following: <br /> Construct extruded cement concrete curb where shown on the Plans and in <br /> accordance with COE Standard Drawing No. 305E. <br /> 8-04.3(2) Extruded Asphalt Concrete Curbs, and Gutters <br /> Supplement 8-04.3(2) by adding the following: <br /> Construct extruded asphalt concrete curbs" where shown on the Plans, or as <br /> directed by the Engineer, in accordance with COE Standard Drawing No. 305D. <br /> 8-04.4 Measurement <br /> Delete all paragraphs in 8-04.4 and substitute the following: ' <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT of the Standard Specifications. <br /> 8-04.5 Payment <br /> Delete all paragraphs in 8-04.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT <br /> AND PAYMENT, of the Standard Specifications. <br /> 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES , <br /> 8-06.1 Description <br /> Supplement 8-06.1 by adding the following: <br /> This Work also includes concrete driveway slabs behind back of sidewalks and <br /> thickened sidewalk driveway approaches. <br /> 8-06.2 Materials <br /> Supplement 8-06.2 by adding the following: <br /> Liquid Membrane-Forming Concrete Curing 9-23.2 Special Provisions <br /> Compounds <br /> Chemical Admixtures for Concrete 9-23.6 Special Provisions <br /> 8-06.3 Construction Requirements <br /> Delete the first two paragraphs of 8-06.3 and substitute the following: ' <br /> Water Main Replacement"Q" Division 8—MISC CONSTRUCTION July 8, 2016 <br /> - Broadway <br /> WO No.—UP3612 SP-166 <br />