My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> ci._ <br /> ! 11 <br /> 12' OW. .011 28' glow ..III IN."—IN."—ji STRIPE GAP STRIPE `r <br /> If_ 40' <br /> ..' LANE WIDTH <br /> MEASUREMENT POINT <br /> LANE STRIPE (WHITE) N i <br /> ! � <br /> I- I <br /> 1 - .--\ I:. <br /> 12' 28' 12' — <br /> — STRIPE 40 GAP _ ` STRIPE <br /> \-- LANE WIDTH <br /> MEASUREMENT POINT <br /> TWO WAY LEFT TURN STRIPE (YELLOW) I <br /> I + _ <br /> t I <br /> 4 $ <br /> _-I <br /> LANE WIDTH 1 <br /> MEASUREMENT POINT <br /> DOUBLE YELLOW CENTER STRIPE <br /> o I <br /> N VEHICLE LANE WIDTH N <br /> MEASUREMENT POINT WHEN — 1 <br /> o r USED AS BICYCLE STRIPE � <br /> co / I <br /> z <br /> A LANE WIDTH MEASUREMENT <br /> N POINT WHEN USED AS GORE <br /> ✓ OR EDGE STRIP <br /> 0+ <br /> 0 <br /> GORE, X=8"; EDGE, W=4"; BICYCLE, W= 8" <br /> 0 <br /> GORE, EDGE, AND BICYCLE STRIPE (WHITE) 1 <br /> 0 <br /> W <br /> J 'm <br /> 0_ <br /> , <br /> O ` <br /> w <br /> 12' on. _ 28' I 12 t <br /> ► STRIPE GAP in- STRIPE I <br /> o <br /> C 40' <br /> ✓ LANE WIDTH <br /> oMEASUREMENT POINT <br /> SKIP CENTER STRIPE (YELLOW) I <br /> 0 <br /> 0 <br /> j-- CITY OF EVERETT 8-14-2001 1 <br /> /�� PUBLIC WORKS PAINT STRIPING DETAILS �date <br /> a ,, jVERETT ENGINEERING & PUBLIC 1 <br /> SERVICES DEPARTMENT 72beer <br /> ater Main Replacement"Q"- Broadway APPEND! A-COE STD DVVGS July ti, tU1b <br />
The URL can be used to link to this page
Your browser does not support the video tag.