My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> / <br /> I CONDUIT TO OTHER 7' <br /> LOOPS SEE PLAN <br /> SHEET FOR SIZE .-- . <br /> , , •;• <br /> : • <br /> AND TYPE <br /> SEE NOTE 8 (TYP) <br /> I <br /> • , i <br /> 0 <br /> SEE NOTE 61 (TYP) <br /> i,. <br /> , .,. <br /> III II PVC CONDUIT 6D <br /> (SEE STD . <br /> r• .. <br /> ! <br /> ' H, <br /> ,1 <br /> ,. , <br /> 806A) 0 IC . 0 ! TYP 0 !I, <br /> I II <br /> I <br /> i 1 <br /> . 0 . . . <br /> I JB PER PLANS <br /> (SEE STD 805) , , : • ; . C.) <br /> I! 0 <br /> I 1 <br /> I : <br /> :. <br /> • <br /> h: 0 <br /> co CONDUIT TYPE H <br /> u-) <br /> AND SIZE TO . :. <br /> .0 <br /> CONTROLLER V : <br /> 0 SEE PLAN SHEET <br /> 0 0 <br /> cs, , <br /> o <br /> . „ <br /> ✓ 0 <br /> I-_- <br /> 1 , <br /> I . <br /> , <br /> 1 . 1 <br /> 1 i <br /> NI <br /> ' . ' <br /> -.:' <br /> I , < <br /> i., a, <br /> STOP LINE CROSSWALK <br /> NOTES: <br /> 1 7 <br /> 9, 1 UNLESS OTHERWISE INDICATED ON PLANS ALL LOOP DETECTORS SHALL BE CENTERED IN <br /> 0,0 THE LANE. <br /> 111 2 FOR LANES 14' AND WIDER, LOOP LAYOUT WILL BE ADJUSTED IN THE FIELD BY THE <br /> ENGINEER. <br /> .1. <br /> E E <br /> iv c, 3 LOOP SPLICING TO LEAD—IN CABLE PER PLANS. <br /> cc D <br /> CC 0 <br /> 4 INSTALL MAXIMUM OF 3 LOOPS PER SAWCUT. ONLY LOOPS ASSOCIATED WITH THE SAME <br /> 0 <br /> g_ SIGNAL PHASE SHALL BE INSTALLED IN THE SAME SAWCUT. <br /> I E i <br /> FOR CROSSWALK AND STOPLINE LAYOUT SEE STD DWG 721. <br /> Tu <br /> aJ 0 <br /> 7:3 <br /> I 1 thi 6 FOR LOOP INSTALLATION SPECIFICATIONS SEE STD DWG 806A & 806B. <br /> 7 HOME RUNS WILL CROSS ADJACENT LANES AT RIGHT ANGLE TO DIRECTION OF TRAVEL SO <br /> . c <br /> AS TO NOT CONFLICT WITH FUTURE LOOP INSTALLATION IN THE ADJACENT LANES. <br /> — c.) <br /> I '. <br /> :z1 f 8 6"x6" WHITE STAMARK TAPE LOCATED AT THE CENTER OF THE LOOP, ORIENTED AS A <br /> C 0 DIAMOND IN THE LANE TO BE INSTALLED BY CITY FORCES OR STRIPING CONTRACTOR. <br /> 010 <br /> I %/' <br /> ° -) 7,-- CITY OF EVERETT TYPICAL TYPE 3 STOP 10-17-2000 <br /> Date: <br /> cu 0 ,__ / PUBLIC WORKS <br /> %EVERETT DEPARTMENT LINE DETECTION LAYOUT 802A <br /> .,zt) , COE Std Dwq: <br /> Water Main Replacement"Q"-Broadway APPEND! A-COE STD DWGS July t3, 2lID <br /> WO No. UP3612 SP-207 <br />
The URL can be used to link to this page
Your browser does not support the video tag.