r <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Supplement 1-05.3 by adding the following: <br /> 1-05.3(1) Submittals <br /> Where required by the Contract Documents, the Contractor shall submit information, <br /> such as Working Drawings that will enable the City's Representative to advise the City <br /> whether the Contractor's proposed materials, Equipment or methods of work are in <br /> general conformance to the design concept and in compliance with the Plans and <br /> Specifications,. Approval or acceptance of a Submittal does not relieve Contractor <br /> from complying with Contract requirements. The City's approval of a Submittal does <br /> not constitute a waiver of the Contract requirements. The City will not be obligated to <br /> accept or pay for Work performed by the Contractor that may be affected by materials, <br /> Equipment, or methods of work not submitted in a timely manner so that final review <br /> can be accomplished before the affected Work is complete. The City shall not be <br /> responsible for Delays, inefficiencies, or any additional costs or expenses caused in <br /> whole or in part by Contractor's failure to submit required information in sufficient time <br /> for review, comment, and correction. Contractor's failure to submit required <br /> information in sufficient time for review, comment and correction shall be deemed a <br /> waiver of any and all Contract Claims for adjustment of Contract Sum or Contract Time <br /> arising out of, or related to, such a Submittal. Contractor acknowledges and agrees <br /> that it may not rely upon receiving the City's response to a Submittal in less than 10 <br /> working days. unless the City explicitly changes this section by a signed Change <br /> Order. <br /> 1-05.3(2) Requests for Information <br /> (******) <br /> Requests for information or clarification from the Contractor to the City shall be treated <br /> as a Submittal pursuant to 1-05.3(1) SUBMITTALS. <br /> 1-05.4 Conformity With and Deviations From Plans and Stakes <br /> Delete all of 1-05.4 and substitute the following: <br /> The Contractor shall be responsible for setting and maintaining all alignment stakes, <br /> slope stakes, and grades necessary for the construction of the roadbed, surfacing, <br /> paving, channelization, illumination, signing, bridges, and retaining walls, if such <br /> construction is included in this Project. Except for the survey control data to be <br /> furnished by the City, calculations, surveying, and measuring required for setting and <br /> maintaining the necessary lines and grades shall be the Contractor's responsibility. <br /> The Contractor shall provide the City with copies of such calculations and staking data <br /> when requested by the Engineer. Copies of the City provided survey control data are <br /> available for the Bidder's inspection at the office of the Project Engineer. <br /> Any staking requirements for the Project that do not fit field conditions will be reviewed <br /> and if necessary adjusted by the Engineer. Any necessary revisions to the staking <br /> information will be provided to the Contractor for use in completing the Work. <br /> Stakes, marks, and other reference points, including existing monumentation, set by <br /> the City shall be carefully preserved by the Contractor. The Contractor will be charged <br /> for the costs of replacing stakes, markers and monumentation that were not to be <br /> ■ disturbed but were destroyed or damaged by the Contractor's operations. This charge <br /> will be deducted from monies due or to become due to the Contractor. <br /> I To facilitate the establishment of these lines and elevations, the City will provide the <br /> Contractor with the following survey control: <br /> Water Main Replacement"Q" Division 1 -GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.-UP3612 SP -57 <br /> I <br />