My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> unauthorized interruption, the Work necessary to reach Substantial and Physical <br /> Completion. The Contractor shall provide the Engineer with a revised schedule <br /> indicating when the Contractor expects to reach substantial and physical completion of <br /> the Work. <br /> The above process shall be repeated until the Engineer establishes the Substantial <br /> Completion Date and the Contractor considers the Work physically complete and <br /> ready for final inspection. <br /> 1-05.11(2) Final Inspection and Physical Completion Date <br /> When the Contractor considers the Work physically complete and ready for final <br /> inspection, the Contractor, by written Notice, shall request the Engineer to schedule a <br /> final inspection. The Engineer will set a date for final inspection. The Engineer and the <br /> Contractor will then make a final inspection and the Engineer will notify the Contractor <br /> in writing of all particulars in which the final inspection reveals the Work incomplete or <br /> unacceptable. The Contractor shall immediately take such corrective measures as are <br /> necessary to remedy the listed deficiencies. Corrective work shall be pursued <br /> vigorously, diligently, and without interruption until physical completion of the listed <br /> deficiencies. This process will continue until the Engineer is satisfied the listed <br /> deficiencies have been corrected. <br /> If action to correct the listed deficiencies is not initiated within seven days after receipt <br /> of the written notice listing the deficiencies, the Engineer may. upon written notice to <br /> the Contractor, take whatever steps are necessary to correct those deficiencies <br /> pursuant to 1-05.7 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK. <br /> The Contractor will not be allowed an extension of Contract Time because of a Delay <br /> in the performance of the Work attributable to the exercise of the Engineer's right <br /> under the authority of the Contract. <br /> Upon correction of all deficiencies, the Engineer will notify the Contractor and the City; <br /> in writing, of the date upon which the Work was considered physically complete. That 111 <br /> date shall constitute the Physical Completion Date of the Contract, but shall not imply <br /> acceptance of the Work or that all the obligations of the Contractor under the Contract <br /> have been fulfilled. <br /> 1-05.11(3) Operational Testing <br /> It is the intent of the City to have at the Physical Completion Date a complete and <br /> operable system. Therefore when the Work involves the installation of machinery or <br /> other mechanical equipment; street lighting, electrical distribution or signal systems; <br /> irrigation systems; buildings; or other similar work it may be desirable for the Engineer <br /> to have the Contractor operate and test the Work for a period of time after final <br /> inspection but prior to the Physical Completion Date. Whenever items of Work are <br /> listed in the Contract Documents for operational testing they shall be fully tested under <br /> operating conditions for the time period specified to ensure their acceptability prior to <br /> the Physical Completion Date. During and following the test period, the Contractor <br /> shall correct any items of workmanship, materials, or Equipment that prove faulty, or <br /> that are not in first class operating condition. Equipment, electrical controls, meters, or <br /> other devices and Equipment to be tested during this period shall be tested under the <br /> observation of the Engineer, so that the Engineer may determine their suitability for the <br /> purpose for which they were installed. The Physical Completion Date cannot be <br /> established until testing and corrections have been completed to the satisfaction of the I <br /> Engineer. <br /> Water Main Replacement"Q" Division 1 —GENERAL CONDITIONS July 8, 2016 <br /> - Broadway <br /> WO No.—UP3612 SP -62 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.