My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> The costs for power, gas, labor, material, supplies, and everything else needed to <br /> ' successfully complete operational testing, shall be included in the unit contract prices <br /> related to the system being tested, unless specifically set forth otherwise in the <br /> Proposal. <br /> Operational and test periods, when required by the Engineer, shall not affect a <br /> manufacturer's guaranties or warranties furnished under the terms of the Contract. <br /> 1-05.12 Final Acceptance <br /> Delete all of 1-05.12 and substitute the following: <br /> The Contractor shall perform all the obligations under the Contract before the <br /> completion date can be established. A certificate of completion of the Work issued by <br /> the City will establish the completion date and certify the Work as complete. The <br /> following shall occur before the completion date can be established: <br /> The Final Contract Voucher Certification shall be signed by the Contractor verifying <br /> agreement to the final contract price. <br /> The physical work on the Project shall be complete. <br /> The Contractor shall furnish all documentation required by the Contract and required <br /> by law, necessary to allow the City to certify the Contract as complete. <br /> A certificate of completion for the Work, signed by the City, will constitute acceptance <br /> of the Work. The issuance of this certificate of completion will not constitute <br /> ' acceptance of unauthorized or defective Work, Equipment, or materials. <br /> The Contractor agrees that neither completion nor final acceptance shall relieve the <br /> Contractor of the responsibility to indemnify, defend, and protect the City against any <br /> claim or loss resulting from the failure of the Contractor, or the Subcontractors or lower <br /> tier subcontractors, to pay all laborers, mechanics, Subcontractors, material persons, <br /> or any other person who provides labor, supplies, or provisions for carrying out the <br /> Work or for any payments required for unemployment compensation under Title 50 <br /> r RCW or for industrial insurance and medical aid required under Title 51 RCW. <br /> Failure of the Contractor to perform all of the Contractor's obligations under the <br /> Contract shall not bar the City from unilaterally certifying the Contract complete so the <br /> Engineer may calculate a final contract price as provided in 1-09.9 PAYMENTS. <br /> 1-05.13 Superintendents, Labor and Equipment of Contractor <br /> ' Delete 1-05.13. <br /> 1-05.14 Cooperation With Other Contractors <br /> Delete all of 1-05.14 and substitute the following: <br /> Nothing in the Contract shall be interpreted as granting to the Contractor exclusive <br /> occupancy of the Project area. The Contractor shall ascertain to its own satisfaction <br /> the scope of the Project and the nature of any other contracts that have been or may <br /> be awarded by the City in the construction of the Project, or to the end that the <br /> Contractor may perform this Contract in the light of such other contracts, if any. <br /> The Contractor shall not cause unnecessary hindrance or Delay to others working on <br /> U this or other projects. If the performance of a contract for the Project is likely to be <br /> interfered with by the simultaneous performance of some other contract or contracts, <br /> the Engineer will decide which Contractor shall cease Work temporarily and which <br /> Contractor shall continue, or whether the Work under the contracts can be coordinated <br /> so that the contractors may proceed simultaneously. On all questions concerning <br /> conflicting interest of contractors performing related Work, the decision of the Engineer <br /> Water Main Replacement"Q" Division 1 -GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.-UP3612 SP -63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.