My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> shall be binding upon all contractors concerned and the City, the Engineer, the City's <br /> Representative, and their consultants shall not be responsible for any damages <br /> suffered or extra costs incurred by the Contractor resulting directly or indirectly from <br /> the Award or performance or attempted performance of any other contract or contracts <br /> on the Project or caused by a decision or omission of the Engineer respecting the <br /> order of precedence in the performance of the contracts. <br /> If, through acts of neglect on the part of the Contractor, any others suffer loss or <br /> damage on the Work, the Contractor agrees to resolve such loss or damage fairly and <br /> expeditiously. If such other shall assert any claim against the City, the Engineer, the <br /> City's Representative, or their consultants on account of any damage alleged to have <br /> been so sustained, the City shall notify the Contractor, who shall hold harmless, <br /> indemnify, and defend the City, Engineer, the City's Representative, and their <br /> consultants, and each of their directors, officers, employees, and agents against any <br /> such claim, including all attorney's fees and any other costs incurred by the <br /> indemnified parties relative to any such claim. <br /> The Contractor shall coordinate its work with other contractors and utility companies <br /> that may have facilities in the Project area and cooperate with them. He shall also <br /> coordinate its activities with the City; and no water mains, individual water services, <br /> street. or private driveways may be closed off without a minimum of five working days <br /> notice to the City and the private property owner. Should the property owner or the <br /> City have adequate reason, as determined by the Engineer, to avoid access or water <br /> service shutoff at the scheduled time, the Contractor shall reschedule its work to meet <br /> the new condition. <br /> Final grading to subgrade and subgrade preparation in those areas disturbed by the I <br /> utilities companies shall be the responsibility of the Contractor and included in the <br /> street construction and no additional compensation will be paid. <br /> The Contractor shall cooperate with the utility companies and their subcontractors and <br /> so conduct its operations that the necessary construction of their facilities can be <br /> accomplished to the mutual satisfaction of the City of Everett and the utility companies. <br /> Supplement Section 1-05 by adding the following new subsections: ' <br /> 1-05.16 Water and Power <br /> (******) <br /> The Contractor shall make necessary arrangements, and shall bear the costs for power , <br /> and water necessary for the performance of the Work, unless the Contract includes power <br /> and water as a pay item. <br /> Contractor shall pay all power and water costs until Substantial Completion, whether such I <br /> power or water is provided by temporary or permanent facilities. City shall not be liable for <br /> any costs or Delays arising out of or caused by the availability or lack of availability of <br /> permanent power or utilities. <br /> 1-05.17 Oral Agreements <br /> (******) <br /> No oral agreement or conversation with any officer, agent, or employee of the City, either I <br /> before or after execution of the Contract, shall affect or modify any of the terms or <br /> obligations contained in any of the documents comprising the Contract. Such oral <br /> agreement or conversation shall be considered as unofficial information and in no way <br /> binding upon the City, unless subsequently put in writing and signed by the City. <br /> Water Main Replacement"Q" Division 1 —GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP-64 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.