<br /> CITY OF EVERETT SPECIAL PROVISIONS
<br /> I
<br /> This unit price bid item includes all costs associated with traffic control — Off-Duty Police
<br /> Officer as identified in 1-10.3 FLAGGING, SIGNS, AND ALL OTHER TRAFFIC CONTROL
<br /> DEVICES of these Special Provisions.
<br /> Bid Item 7 - Maintenance and Protection of Traffic Control
<br /> Measurement and Payment: Lump Sum (LS)
<br /> Measurement for Maintenance and Protection of Traffic Control shall be the ratio of the
<br /> number of working days completed to the total number of working days authorized in the
<br /> Contract.
<br /> This lump sum bid item includes the maintenance and protection of traffic control materials,
<br /> 1 tools, and equipment necessary to accomplish the Work in accordance with 1-10.3(2)
<br /> TRAFFIC CONTROL PROCEDURES, including yet not limited to, signs, barricades, cones,
<br /> flashers, reader boards, and temporary pavement markings. Also included is cost
<br /> associated with preparation and distribution of public notices involving parking, street
<br /> access or traffic issues.
<br /> Bid Item 8 - Trench Excavation Safety Systems
<br /> Measurement and Payment: Lump Sum (LS)
<br /> Measurement for trench excavation safety systems shall be the ratio of pipe installed and
<br /> backfilled to the total quantity of pipe listed on the Proposal.
<br /> +� The lump sum bid item includes the costs directly allocated to the safety system for
<br /> trenches and all other excavations including, but not limited to, shoring, benching, bracing,
<br /> excavation, sheeting, and trench box. This Work shall be accomplished in accordance with
<br /> Divisions 1, 2, 7, and 8 of the Standard Specifications and these Special Provisions.
<br /> Payment per lump sum includes all equipment, materials, labor, installation, and removal,
<br /> and all other work required to meet the trench excavation and safety system requirements.
<br /> Bid Item 9 - Street Cleaning and Sweeping
<br /> Measurement and Payment: Unit Price per Hour (HR)
<br /> The unit price per hour for Street Cleaning & Sweeping shall be full compensation for all
<br /> labor, tools, incidentals, and equipment necessary to provide the street sweeping, cleaning,
<br /> and dust control water required for this project.
<br /> Measurement for street sweeping and cleaning will be by the hour for the actual time
<br /> consumed in pavement sweeping, cleaning and debris removal. No allowance will be
<br /> made for time consumed in making repairs to the equipment or for moving the equipment to
<br /> or from the site on which the street cleaning is ordered. No separate payment will be made
<br /> I for water required for dust control and the normal operation of the pickup sweepers.
<br /> Bid Item 10 - Erosion/Water Pollution Control
<br /> Measurement and Payment: Force Account (FA)
<br /> This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE
<br /> ACCOUNT; except, as modified below.
<br /> Erosion/Water Pollution Control, Force Account, shall constitute full compensation for all
<br /> labor, materials, tools and equipment necessary and incidental for the installation,
<br /> maintenance and removal of the temporary erosion and sedimentation control (TESC)
<br /> facilities to prevent pollution, erosion, siltation, and damage to any wetland, stream, other
<br /> watercourse, or surrounding property throughout the life of the Contract. TESC facilities
<br /> shall include, but not be limited to, any cover measures, runoff control measures, soil and
<br /> Water Main Replacement"Q" Division B—BID DESCRIPTIONS July 8, 2016
<br /> -Broadway
<br /> WO No.—UP3612 SP-5