My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> site stabilization measures, filter fabric fencing as shown on the Plans, and inlet protection <br /> measures for the work area and downstream areas. <br /> The TESC measures shall limit the erosion possibility by covering disturbed soils, 111 <br /> preventing sloughing or raveling of cut and natural slopes, and controlling surface runoff <br /> from flowing into excavations using measures such as curbs, berms, dikes, rock-lined <br /> ditches, and other approved measures. Filter fabric fence shall be used to treat small <br /> areas of non-concentrated runoff prior to discharge from the site. <br /> Bid Item 11 - Saw-Cutting Asphalt Concrete Pavement, Final Joint Cut, Up To 7-Inch <br /> Thickness <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. I <br /> The unit price per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 7- <br /> inch thickness, shall be full compensation for all labor, material, tools, and equipment <br /> necessary to satisfactorily complete the Work as specified in Section 2-02.3(3) of the <br /> Standard Specifications, these Special Provisions and as shown on the Plans. The unit <br /> price per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 7-inch <br /> thickness includes, but is not limited to, the saw-cutting necessary for the final joint <br /> between existing pavement and permanent HMA pavement. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 12 - Saw-Cutting Asphalt Concrete Pavement, Final Joint Cut, Additional 1- <br /> Inch Thickness <br /> Measurement and Payment: Unit Price per Linear Foot (LF) I <br /> The unit price per lineal foot for the final saw-cutting of concrete pavement thickness, for <br /> each full 1-inch depth beyond the initial 7-inch thickness, shall be full compensation for all <br /> labor, material, related work, tools, and equipment necessary to satisfactorily complete the <br /> Work as specified in Section 2-02.3(3) of the Standard Specifications, these Special <br /> Provisions and as shown on the Plans. The unit price per lineal foot for the final saw-cutting <br /> of concrete road or street pavement thickness, for each full 1-inch depth beyond the initial <br /> 6-inch thickness, includes the saw-cutting necessary for the final joint between existing <br /> pavement and permanent HMA pavement. For measurement purposes, standard rounding <br /> procedures shall be followed. For example, 1.0 to 1.49 inches shall be measured as 1 <br /> inch, and 1.50 to 2.49 inches shall be measured as 2 inches. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 13 - Saw-Cutting Concrete Pavement, Final Joint Cut, Up To 7-Inch <br /> Thickness <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of concrete pavement, up to 7-inch <br /> thickness, shall be full compensation for all labor, material, tools, and equipment necessary <br /> to satisfactorily complete the Work as specified in Section 2-02.3(3) of the Standard <br /> Specifications, these Special Provisions and as shown on the Plans. The unit price per <br /> lineal foot for the final saw-cutting of concrete pavement, up to 7-inch thickness includes, <br /> but is not limited to, the saw-cutting necessary for the final joint between existing concrete <br /> pavement and permanent concrete pavement repair. <br /> Water Main Replacement"Q" Division B—BID DESCRIPTIONS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP-6 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.