I <br /> ICITY OF EVERETT SPECIAL PROVISIONS <br /> Contractor, both prior to the start of, and throughout, construction, is vital to the <br /> I success of this Project for both the Contractor and the City. The purposes of the <br /> schedules and reports include: <br /> 1. Ensuring adequate planning and execution of the Work by the Contractor. <br /> 1 2. Assisting the City or its representative in monitoring construction. <br /> 3. Assessing the impact of any actual, potential or proposed change, including, <br /> but not limited to, the financial impact resulting from schedule changes and <br /> Ichanges to the scope of Work. <br /> 4. Supporting the basis for construction payments. <br /> 5. Planning by City and tenants. <br /> 6. Avoiding additional or extra costs or expenses to the City. <br /> All schedules will be reviewed by the City and the City's Representative. The City or <br /> 1 City's Representative's review of any schedule shall not transfer the Contractor's <br /> responsibilities to the City. Review shall not constitute approval or acceptance of the <br /> Contractor's construction means, methods, sequencing, logic, order, precedence and <br /> succession of activities or Contractor's ability to complete the Work in a timely manner. <br /> I Any mistakes or errors in any schedule, including, but not limited to, mistakes or errors <br /> of logic, order, precedence, and duration, are and remain the Contractor's. The City or <br /> City's Representative may; however, comment upon the schedule. The Contractor <br /> I remains wholly responsible for completing the Work within the Contract duration. Any <br /> comments by City or City's Representative personnel regarding the schedule shall not <br /> be construed as approval or ratification, nor shall the Contractor incorporate or change <br /> I its schedule as a result of City or City's Representative comments in the absence of an <br /> express written directive to that effect. <br /> Contractor shall submit, update and maintain schedules as required by the Contract <br /> I Documents, <br /> The Contractor shall provide sufficient material, equipment, and labor to meet the <br /> interim milestones, Substantial Completion. Physical Completion and Completion <br /> Dates provided by the Contract Documents. The City allocates its resources to a <br /> Contract based on the total time allowed in the Contract. The Contractor may submit a <br /> schedule indicating Completion Date earlier than the end of Contract Time, but City <br /> cannot guarantee its resources will be available to meet such schedule. City shall not <br /> II pay or be liable for any additional compensation if the Contractor is not able to meet a <br /> schedule that indicates a Completion Date earlier than the end of Contract Time. <br /> Failure to schedule City furnished or installed materials and Equipment for installation <br /> I on or after its planned arrival pursuant to the City's Contract with the supplier or failure <br /> to notify the City in writing of tasks dependent upon the fact or date of arrival of such <br /> City furnished materials and Equipment, constitute a waiver by Contractor of any <br /> I Contract Claim arising out of or related to the timeliness of the furnishing or installation <br /> of such material and Equipment. All schedules shall allow for timely incorporation of <br /> any other's work under separate contract with City and for timely incorporation of any <br /> work provided and installed by City. Unless otherwise expressly authorized in writing <br /> I by the City's Representative, the Contractor shall integrate the schedules with the <br /> Schedule of Values and unit price items so that each construction activity is <br /> represented by a dollar value. <br /> IFloat in a progress schedule belongs to the City. <br /> I Water Main Replacement"Q" Division 1 —GENERAL CONDITIONS July 8, 2016 <br /> Broadway <br /> WO No.—UP3612 SP-89 <br /> I <br />