I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Subcontractors shall review all schedules prior to submission to the City and City's <br /> Representative. At the City's option and sole discretion, City may require Contractor to <br /> obtain written acceptance of each schedule by Subcontractors as practical and <br /> feasible, as the schedule relates to Subcontractors' work. <br /> Contractor shall not schedule any activity with an unrealistic, unduly long, or unduly <br /> short duration. Contractor shall use its best efforts in good faith to set reasonable <br /> durations for all activities. Contractor shall not attempt to "grab the Float" or make an <br /> effort to use Float in the Progress Schedule for the benefit of the Contractor. rather <br /> than the benefit of the Project. Contractor shall use its best efforts in good faith to <br /> minimize dependencies, minimize the number of critical paths, and schedule the <br /> Project to be complete as expeditiously as reasonably possible. <br /> Contractor shall submit with each application for payment or progress pay estimate an <br /> updated progress schedule, but no less often than monthly. If requested by the City's <br /> Representative or the City, Contractor shall prepare and submit updated progress <br /> schedules from time to time that may be more frequent than monthly. <br /> The Contractor hereby expressly agrees and acknowledges that any failure by <br /> Contractor to provide accurate, complete, current and updated schedules at least <br /> monthly constitutes a waiver of any and all claims or requests for adjustment of <br /> Contract Sum or Time that arise out of, result from, or are caused by, any Delay on the <br /> Project or scheduling of the Work. Timely submission of updated schedules at least <br /> monthly is a condition precedent to any later or subsequent Contract Claim or request <br /> for an adjustment of either Contract Sum or Time related to or arising out of time, an <br /> alleged Delay, or the schedule or sequence of Work. Similarly, the parties agree the <br /> City may withhold progress pay estimates if updated schedules are not timely <br /> submitted monthly. These remedies are cumulative and not exclusive of other remedy. <br /> The City's use of one or more of these remedies does not constitute an election or <br /> prevent the City from pursuing other remedies for this or other defaults. I <br /> No later than the pre-construction conference, Contractor shall submit a preliminary <br /> schedule ("Preliminary Schedule") for the entire Work to City's Representative and <br /> City. Contractor shall prepare such schedule in consultation with its Subcontractors. <br /> 1-08.3(2) Project Schedule Types <br /> Delete 1-08.3(2), including its subsections, and substitute the following: <br /> 1-08.3(2) Project Schedule Requirements For Contracts Exceeding $500,000 I <br /> (******) <br /> 1-08.3(2)A Scheduler <br /> Contractor represents and warrants that it employs, or will engage prior to <br /> preparation of the Preliminary Schedule, a qualified scheduler. A "qualified <br /> scheduler" is a person who has at least five years of full time, construction project <br /> scheduling experience, who is familiar, competent and professional in creating, <br /> maintaining and updating time scaled and resource loaded critical path schedules. <br /> Contractor shall submit to the City the name, address, and qualifications of the <br /> qualified scheduler to the City for approval no later than the pre-construction <br /> conference. <br /> 1-08.3(2)B Baseline Schedule <br /> The progress schedule submitted to the City's Representative and City after their <br /> review of the Preliminary Schedule shall be the Baseline Schedule. The Baseline <br /> Schedule shall be the baseline schedule against which all future schedules are <br /> _ compared and updated, and job progress is measured. The Baseline Schedule <br /> Water Main Replacement"Q" Division 1 —GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP -90 <br /> I <br />