I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Upon completion of pipe installation and trench backfilling to specifications, promptly <br /> 1 restore street traffic lanes, driveway and sidewalk surfaces with Temporary Pavement <br /> Patch or heavy duty steel plates and permit public use along with access for City <br /> inspection activities. <br /> Parking spaces are very limited in the project area and the Contractor will be required <br /> to cooperate with the City in resolving parking issues. Businesses and residents who <br /> rely on on-street parking and are displaced by the construction shall be given priority <br /> for the nearest available parking location. The Contractor's employees may be <br /> required to park their personal vehicles away from the area of construction. <br /> As City forces will make connection to existing watermains, Contractor is directed to <br /> thoroughly review 7-09.3(19)A — CONNECTION TO EXISTING MAINS for procedure, <br /> coordination and notification. <br /> 1-08.5 Time for Completion <br /> Delete all of 1-08.5 and substitute the following: <br /> 1-08.5(1) General <br /> The Contractor shall complete all physical Contract Work within the number of <br /> "working days" stated in the Contract Provisions or as extended by the Engineer in <br /> accordance with Section 1-08.8. Every day will be counted as a "working day" <br /> unless it is a nonworking day or an Engineer determined unworkable day. A <br /> nonworking day is defined as a Saturday, a Sunday, a whole or half day on which <br /> the Contract specifically prohibits Work on the critical path of the Contractor's <br /> approved progress schedule, or one of these holidays: January 1, the third <br /> Monday of January, the third Monday of February, Memorial Day, July 4, Labor <br /> Day, November 11, Thanksgiving Day, the day after Thanksgiving, and Christmas <br /> Day. When any of these holidays fall on a Sunday, the following Monday shall be <br /> counted a nonworking day. When the holiday falls on a Saturday, the preceding <br /> Friday shall be counted a nonworking day. The days between December 25 and <br /> January 1 will be classified as nonworking days. <br /> An unworkable day is defined as a half or whole day the Engineer declares to be <br /> unworkable because of weather or conditions caused by the weather that <br /> prevents satisfactory and timely performance of the Work shown on the critical <br /> path of the Contractor's approved progress schedule. Other conditions beyond the <br /> control of the Contractor may qualify for an extension of time in accordance with <br /> Section 1-08.8. <br /> Contract Time shall begin on the effective date of the Notice to Proceed. The <br /> Contract Documents may specify another starting date for Contract Time, in which <br /> case, Contract Time will begin on the starting date the Contract Documents <br /> specify. <br /> Each working day shall be charged to the Contract as it occurs, beginning on the <br /> effective date of the Notice to Proceed, unless otherwise provided in the Contract <br /> Documents, until the Contract Work is physically complete. Each week the <br /> Engineer will provide the Contractor a statement that shows the number of <br /> working days: (1) charged to the Contract the week before; (2) specified for the <br /> physical completion of the Contract; and (3) remaining for the physical completion <br /> of the Contract. The statement will also show the nonworking days and partial or <br /> whole day the Engineer declares as unworkable. Within 14 calendar days after <br /> the date of each statement, the Contractor shall file a written protest of any <br /> alleged discrepancies in it. To be considered by the Engineer, the protest shall be <br /> Water Main Replacement"Q" Division 1 -GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.-UP3612 SP -95 <br /> I <br />