My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Faber Construction Corp 9/27/2016
>
Contracts
>
Capital Contract
>
Faber Construction Corp 9/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 11:58:56 AM
Creation date
10/13/2016 11:42:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Faber Construction Corp
Approval Date
9/27/2016
Council Approval Date
8/17/2016
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Q Broadway
Public Works WO Number
UP 3612
Tracking Number
0000297
Total Compensation
$721,228.06
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Faber Construction Corporation 4/11/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Faber Construction Corporation 5/15/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS 1 <br /> in sufficient detail to enable the Engineer to ascertain the basis and amount of <br /> time disputed. By not filing such detailed protest in that period, the Contractor <br /> shall be deemed as having accepted the statement as correct. If the Contractor <br /> elects to work ten hours a day and four days a week (a 4-10 schedule) and the <br /> fifth day of the week in which a 4-10 shift is worked would ordinarily be charged as <br /> a working day then the fifth day of that week will be charged as a working day <br /> whether or not the Contractor works on that day. <br /> The Engineer will give the Contractor written notice of the Physical Completion <br /> Date for all Work the Contract requires. That date shall constitute the Physical <br /> Completion Date of the Contract, but shall not imply the City's acceptance of the <br /> Work or the Contract. 111 <br /> The Engineer will give the Contractor written notice of the Completion Date of the <br /> Contract after all the Contractor's obligations under the Contract have been <br /> performed by the Contractor. The following events must occur before the <br /> Completion Date can be established: <br /> 1. The physical Work on the project must be complete; and <br /> 2. The Contractor shall furnish all documentation required by the Contract I <br /> and required by law, to allow the City to process final acceptance of the <br /> Contract. <br /> The following documents must be received by the Engineer prior to establishing a 1 <br /> Completion Date: <br /> a. Certified payrolls. <br /> b. Material Acceptance Certification Documents. <br /> c. Annual Report of Amounts Paid as MBE/WBE Participants. <br /> d. Final Contractor Voucher Certification. <br /> Supplement 1-08.5 by adding the following: <br /> 1-08.5(2) Substantial Completion <br /> (******) <br /> When the Contractor considers the Work to be Substantially Complete and ready for <br /> its intended use, it shall give Notice to the City's Representative. The Notice shall <br /> include an itemized list of remaining incomplete Work. If the City's Representative <br /> determines the Work is not substantially complete. it will so notify the Contractor in111 <br /> writing, identifying the reasons for such a determination. If the City's Representative <br /> finds the Work substantially complete, it will meet with the Contractor to (1) prepare a <br /> Punch List of incomplete items of Work; (2) define the division of responsibility <br /> between City and Contractor with respect to security, operation, maintenance, heat, <br /> utilities, insurance, and warranties; and (3) describe other issues related to acceptance <br /> of the substantially completed Work. <br /> 111 <br /> If the City's Representative is not an employee of the City, the City's Representative <br /> will write to the City upon reaching agreement with the Contractor, certifying that the <br /> Work is substantially complete, listing the items of incomplete Work, stating the date <br /> for completion of incomplete work. defining the division of responsibilities, and setting <br /> forth any other terms related to acceptance. In such event, the City will review the <br /> City's Representative's certification that the Work is substantially complete. If the City <br /> concurs, the City will notify the Contractor in writing that the Work is accepted as <br /> substantially complete. Except for any portion(s) of Work specified for early <br /> completion or required by the City for early possession, Substantial Completion will not <br /> Water Main Replacement"Q" Division 1 —GENERAL CONDITIONS July 8, 2016 <br /> -Broadway <br /> WO No.—UP3612 SP-96 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.