My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants LLC Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BHC Consultants LLC Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 10:48:46 AM
Creation date
10/19/2016 10:48:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants LLC
Approval Date
10/4/2016
Council Approval Date
9/28/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulator 4 and 39 modifications
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$356,897.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> SCOPE OF SERVICES <br /> Reid Middleton,Inc. <br /> BHC Consultants, LLC <br /> City of Everett R4 & R39 Regulator Mods <br /> Roadway Restoration and Surveying <br /> A. PROJECT UNDERSTANDING <br /> BHC Consultants requires the services of Reid Middleton, Inc. to prepare plans, <br /> specifications, and estimate for roadway restoration associated with design upgrades to <br /> the sewer and storm drainage system at two intersections in Everett, Washington. <br /> Roadway restoration work will include replacement of existing pavement with new <br /> concrete pavement and replacement of existing curb ramps with new ADA compliant <br /> curb ramps at the following intersections: <br /> • Chestnut Street and Alley(approx. 300 feet south of 26th Street) <br /> • Summit Avenue and 26th Street <br /> Reid Middleton will also conduct additional topographic survey to facilitate the design of <br /> improvements. <br /> B. ASSUMPTIONS <br /> • Both intersections contain existing concrete panels underneath asphalt pavement <br /> that will be replaced with new concrete pavement panels. The limits of <br /> intersection pavement replacement will extend to the new curb return limits. <br /> • Existing curb returns, curb ramps and sidewalk will be replaced and/or modified <br /> as follows: <br /> 1. Chestnut Street and Alley <br /> a. Extend curb, gutter, and sidewalk around southeast corner of <br /> intersection to connect existing sidewalks. <br /> b. Provide new curb return on northwest corner. <br /> c. Provide a total of three new curb ramps: one on the northwest <br /> corner for both east/west and north/south crossings; one on the <br /> south side of the alley for north/south crossing; and one on the <br /> west side of Chestnut for east/west crossing. <br /> BHC Consultants Scope of Services <br /> Everett R4&R39 Regulator Mods-Roadway Restoration&Surveying 1 of 8 <br /> September 9,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.