Laserfiche WebLink
2. Summit Avenue and 26th Street <br /> a. Replace eastern half of curb return in the northeast corner and <br /> provide one new curb ramp for north/south crossing. <br /> b. Replace entire curb return in southeast corner and provide one curb <br /> ramp for north/south crossing and one curb ramp for east/west <br /> crossing. <br /> c. Replace partial curb return in southwest corner and provide one <br /> curb ramp for east/west crossing. A total of four new curb ramps <br /> will be provided. <br /> • All work within WSDOT limited access right-of-way will be permitted by others. <br /> • All environmental documentation will be provided by others. <br /> • Roadway restoration work associated with the parallel pipe option for R4 is not <br /> included. <br /> • Full street closures will be allowed at both intersections for the duration of <br /> construction. <br /> • Storm drainage design is not included. Storm drainage modifications associated <br /> with roadway restoration is limited to adjustment of existing catch basins to <br /> grade. <br /> • Cover, Sheet Index, Legend and Abbreviations, and Construction Staging plan <br /> sheets will be provided by BHC Consultants and are not included. <br /> • Design of walls or rockeries is not included. <br /> • Geotechnical investigation is not required. <br /> • It is assumed that all new curb ramps will be fully ADA compliant and that MEF <br /> documentation will not be necessary. If MEF documentation is required, the <br /> work will be performed under a supplement to this agreement. <br /> C. SCOPE OF SERVICES <br /> 1. Management/Coordination/Administration <br /> a. Provide continuous project management and administration(team <br /> coordination, billing invoices,and monthly progress reports)throughout <br /> the project. <br /> BHC Consultants Scope of Services <br /> Everett R4&R39 Regulator Mods-Roadway Restoration&Surveying 2 of 8 <br /> September 9,2016 <br />