My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHC Consultants LLC Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
BHC Consultants LLC Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 10:48:46 AM
Creation date
10/19/2016 10:48:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
BHC Consultants LLC
Approval Date
10/4/2016
Council Approval Date
9/28/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer Regulator 4 and 39 modifications
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$356,897.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(4) The City of Everett will provide field books for the project. All <br /> notes will be recorded within the City of Everett's field books. A <br /> survey report will also be prepared and submitted to the City of <br /> Everett at the end of the project for their records. <br /> b. Utility Coordination <br /> (1) Review utility as-built records to assist in mapping utility lines. <br /> c. Horizontal Control <br /> (1) Tie into the City of Everett's existing horizontal control network. <br /> (2) Establish horizontal control points for project control. <br /> d. Vertical Control <br /> (1) Tie into the City of Everett's existing vertical control network. <br /> (2) Establish bench marks adjacent to the site location. <br /> (3) Establish elevations of all topographic survey control points. <br /> e. Right-of-Way and Boundary Lines <br /> (1) Right-of-way and property lines along all roadways will be <br /> determined based on the right-of-way drawings provided by the <br /> City of Everett. <br /> (2) Property corners will not be set as a part of this phase of work. <br /> f. Topographic Survey <br /> Provide a topographic survey of the sites, adjacent streets and 25-feet <br /> beyond the project site. The topographic survey will include <br /> measurements and features within the survey limits as follows: <br /> (1) Locations and elevations of surface types and features including <br /> sidewalks, curb and gutter, driveways, curb ramps,road pavement, <br /> striping, crosswalks, concrete slabs, equipment foundations, etc. <br /> (2) Storm drainage: Catch basins and manholes, including pipe size, <br /> material and upstream and downstream invert elevations; culverts, <br /> including pipe size, material and upstream and downstream invert <br /> elevations. <br /> (3) Sanitary sewers: Manholes, including pipe size,type and invert <br /> elevations; weir elevations, rims and structure inverts. <br /> BHC Consultants Scope of Services <br /> Everett R4&R39 Regulator Mods-Roadway Restoration&Surveying 6 of 8 <br /> September 9,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.