Laserfiche WebLink
• Final Opinion of Probable Construction Cost in PDF and Excel format <br /> 7. Construction Support <br /> a. Reid Middleton will provide design engineering support to include <br /> submittal reviews, RFI's and site visits. A total of 24 hours is allocated <br /> for this support. If additional effort is required,the work will be <br /> performed under a supplement to this agreement. <br /> 8. Survey Services <br /> Reid Middleton will provide additional topographic surveying locating the <br /> concrete joints at the intersection of 26th Street and Summit Avenue. In addition, <br /> a partial survey of the off-ramp of I-5 onto Everett Avenue will be conducted to <br /> provide mapping for traffic control plans. Field data will be added to the existing <br /> base map prepared by Reid Middleton in AutoCAD Civil 3D format. <br /> ASSUMPTIONS <br /> • The survey will be based on the City of Everett's horizontal coordinate <br /> datum and vertical datum. <br /> • The survey will be prepared in US Survey feet units. <br /> • The Client will arrange for and coordinate survey team access to the <br /> project site on private property and WSDOT right-of-way, if needed. <br /> • Trees greater than six inches DBH will be located and mapped using their <br /> common name. <br /> • Survey mapping will be developed at one-foot contour intervals. <br /> Measurements will be taken on an approximate 25-foot grid. Elevations <br /> will be shown by contours lines. <br /> a. Management/Coordination/Administration <br /> (1) Provide continuous survey team project management and <br /> administration(billing invoices and monthly progress reports) <br /> throughout the project. <br /> (2) Acquire right-of-way documents and maps from the City of <br /> Everett to be shown on survey base map. <br /> (3) Attend up to three project meetings with the design team. <br /> BHC Consultants Scope of Services <br /> Everett R4&R39 Regulator Mods-Roadway Restoration&Surveying 5 of 8 <br /> September 9,2016 <br />