Laserfiche WebLink
that they concur. If I had Bill Dolan send you the verbiage below(or something similar) would that meet documentation <br /> requirements? <br /> Thanks, <br /> Pete <br /> -------------- Proposed Verbiage --------------------------------------------------------- <br /> "In order to meet stormwater management requirements for this project, Snohomish County Airport—(Paine Field) <br /> concurs that it will contract with the Boeing Company to provide storm water detention in the airport's Alpha regional <br /> detention facility (Alpha Pond). Stormwater treatment will occur, in accordance with the airport's requirements, prior <br /> to discharge to the Alpha Pond. Snohomish County also concurs that it will be responsible for the review and approval <br /> of the stormwater treatment and flow control facilities and design documents for this project. However, other storm <br /> water facilities on the site—such as conveyance systems—will be designed and constructed in accordance with City <br /> standards and reviewed by the City." <br /> Pete, Mr4W:4-& <br /> Pete McGuire <br /> The Boeing Company <br /> Land Use and Civic Affairs <br /> Phone:425-238-3768 <br /> Fax (425)266-8105 <br /> From: Paul McKee [ma iIto:PMckeeCabeverettwa.Qov] <br /> Sent: Thursday, May 21, 2015 4:52 PM <br /> To: McGuire, Peter D <br /> Subject: FW: SEPA #15-14, 2243 W Casino Rd, 45-12 building <br /> FYI... <br /> On May 21, 2015, at 11:21 AM, Jane Zimmerman<JZimmermangeverettwa. og_v> wrote: <br /> Hi Kirk— <br /> I have the following comments on this project: <br /> In order to meet stormwater management requirements for this project, the Boeing Company will <br /> contract with the Snohomish County Airport—Paine Field (Airport) to provide storm water detention in <br /> the Airport's Alpha regional detention facility(Alpha Pond). Stormwater treatment will occur, in <br /> accordance with the Airport's requirements, prior to discharge to the Alpha Pond. Therefore, <br /> Snohomish County will be responsible for the review and approval of the stormwater treatment and <br /> flow control facilities and design documents for this project. However, other storm water facilities on <br /> the site—such as conveyance systems—will be designed and constructed in accordance with City <br /> standards. <br /> Thank you, <br /> t t�S <br />