Laserfiche WebLink
IF I'm remembering correctly (!), I've already seen what I need to see in order to sign the project's on-site stormwater <br /> drainage system. However, my memory isn't all that good anymore, and I'm currently located in a temporary office and <br /> I don't have the report you submitted with me. I'll check with our Permit Services group and get back to you as soon as <br /> possible. <br /> Thank you, <br /> Jane <br /> Jane Zimmerman, Sr Engineer <br /> City of Everett Public Works Department <br /> phone: 425-257-8885 fax: 425-257-8882 <br /> e-mail:izimmerman(cDeverettwa.gov <br /> From: Furr, Dean [mailto:furr(acoffman.com] <br /> Sent: Friday, July 24, 2015 2:11 PM <br /> To: Jane Zimmerman <br /> Cc: Paul McKee; David Hall; Hazen, Allison; Ojala, Emery <br /> Subject: RE: Boeing 45-012 Static Test Building <br /> Jane, <br /> Thank you for the reply, but unfortunately we were put on hold for this project so we have been slow to respond to this <br /> and other issues. <br /> What do you need to approve/permit the storm drainage conveyance? <br /> Thank You, <br /> Dean Furr, P.E., CESCL <br /> Engineer, Civil Engineering <br /> Coffman Engineers, Inc. <br /> p 206.623.0717 1 f 206.624.3775 www.coffman.com <br /> LASTING creativity I results I relationships <br /> Please consider the environment before printing this email. <br /> From:Jane Zimmerman [mailto:JZimmerman@everettwa.gov] <br /> Sent:Thursday,June 25, 2015 3:36 PM <br /> To: Furr, Dean <furr@coffman.com> <br /> Cc: Paul McKee<PMckee@everettwa.gov>; David Hall<DHall@everettwa.gov> <br /> Subject: FW: Boeing 45-012 Static Test Building <br /> Importance: High <br /> Hi Dean— <br /> I am really not comfortable with Jan O'Neill's email as it seems to put the responsibility for determining the site's flow <br /> control requirements for this site on the City. The City would not vest this project to the City's pre-2010 standards. My <br /> understanding is that the Airport had already construct <br /> ed the Alpha pond in the past to receive runoff from this site—and the Airport believed that their decision to provide <br /> that volume in accordance with the 1992 standards was vested. However,Jan's email seems to indicate that City <br /> standards apply to the site, which defeats Boeing's purpose in contracting with the Airport to begin with. <br /> aiD( <br />